Search Forum
Filters:
Dharwad Belgavi new line alignmnent starts at 6km from Dharwad and ends at 11km before Belgavi and the total route length of new line will be 73km and distance is 90km. The present route length via londa is 122km and a distance of 32km will get reduced.
Attached Chainage of new line with km source Bellari jn Facebook page.
Attached Chainage of new line with km source Bellari jn Facebook page.
AS per google latest image it seems old building is dismantled and new station building has been constructed. Also it seems two new platform being constructed. if member from Gonda side can verify.
1 Posts
Today (10:39) LKO/Lucknow Charbagh NR (9 PFs)
ANKITSRIVASTAVA12._^~
ANKITSRIVASTAVA12._^~ 2922 blog posts𝐑𝐞𝐧𝐮𝐦𝐛𝐞𝐫𝐢𝐧𝐠 𝐨𝐟 𝐍𝐑 𝐩𝐚𝐬𝐬𝐞𝐧𝐠𝐞𝐫 𝐭𝐫𝐚𝐢𝐧𝐬 𝐰𝐢𝐭𝐡 𝐫𝐞𝐠𝐮𝐥𝐚𝐫 𝐧𝐮𝐦𝐛𝐞𝐫𝐬 𝐰𝐞𝐟 𝟎𝟏/𝟎𝟕/𝟐𝟎𝟐𝟒 𝐚𝐬 𝐰𝐚𝐬 𝐫𝐮𝐧𝐧𝐢𝐧𝐠 𝐝𝐮𝐫𝐢𝐧𝐠 𝐩𝐫𝐞-𝐂𝐎𝐕𝐈𝐃 𝐩𝐞𝐫𝐢𝐨𝐝.
【𝐒𝐞𝐫𝐢𝐚𝐥 𝐍𝐮𝐦𝐛𝐞𝐫 𝟏𝟐𝟓 से 𝟏𝟒𝟐 देखें.】
【𝐒𝐞𝐫𝐢𝐚𝐥 𝐍𝐮𝐦𝐛𝐞𝐫 𝟒𝟒𝟐 से 𝟒𝟓𝟓 देखें.】
【𝐒𝐞𝐫𝐢𝐚𝐥 𝐍𝐮𝐦𝐛𝐞𝐫 𝟏𝟐𝟓 से 𝟏𝟒𝟐 देखें.】
【𝐒𝐞𝐫𝐢𝐚𝐥 𝐍𝐮𝐦𝐛𝐞𝐫 𝟒𝟒𝟐 से 𝟒𝟓𝟓 देखें.】
Yesterday (17:16) 55021/Samastipur - Siwan Passenger (UnReserved) | SPJ/Samastipur Junction (7 PFs)
WAP7NFRMLDT~
WAP7NFRMLDT~ 867 blog postsFirst Coaching notification after formation of new Goverment!!!
55021 Samastipur- Siwan- Samsatipur Passenger Restored!!!!!
Pic credit- X
55021 Samastipur- Siwan- Samsatipur Passenger Restored!!!!!
Pic credit- X
14 Posts
More Posts