Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

RailFans - once you meet them, friends for life

Search Forum
Filters:
Page#    63330 Blog Entries  <<prev  next>>
Info Update
5640 views
1

Today (15:35)   19609/Udaipur City - Yog Nagari Rishikesh Express (PT) | UDZ/Udaipur City (5 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   509 blog posts
Entry# 6099864            Tags   Past Edits
Railways should increase the frequency of 19609/10 Udaipur Yog Nagari Rishikesh from three days a week to four days a week as given below -

Currently this train run with 2 lhb rakes and should utilise both rakes like this -

With
...
more...
first rake of this train 19609 railways should run this between Udaipur to ynrk or Yog Nagari Rishikesh on Monday and Thursday and 19610 ynrk to Udaipur on Tuesday and Friday

And

with second rake of this train 19609 railways should this train between Udaipur to ynrk on wednesday and saturday and 19610 ynrk to Udaipur on Thursday and Sunday and should also change the coach composition of this train as given in these imaginary trains and should also change it's time table as given in these imaginary trains

And

for further information refer to these blogs - 6099826 , 6099857 or refer to the links given below -

/train/230016

/train/230020

Translate to English
Translate to Hindi
Info Update
29665 views
2

Jun 13 (10:32)   12801/Purushottam Express (PT) | PURI/Puri (8 PFs)
PrakharYadav^~
PrakharYadav^~   13170 blog posts
Entry# 6093763            Tags   Past Edits
1 compliments
Disagree:Shame on Indian Railways!!!!!!!!!!
UPDATE : /blog/post/6099799

Sub: - Renumbering of ECOR owned trains in new time table effective from 01.07.2024
Ref: - CPTM/ECOR COIS message no. 253 /ECoR/PCOM/CHG/PTT/15/24dated 11.06.2024.

No.1-TT/Change
...
more...
in WTT/2023-24. Vide reference to (1) above, East Coast Railway has notified to revise the following train numbers with effect new time table which will come into effect from 01.07.2024. The details are
as under-

 (A)Renumbering of ECoR owning Express Trains w.e.f. 01.07.2024

Translate to English
Translate to Hindi

16904 views
3

Jun 13 (11:27)
fanof12801~
fanof12801~   262 blog posts
Re# 6093763-1              
12801 is highest revenue generating train. Runs fully jampacked throughout the year. Now if railway does this, railway will only face the loss in revenue. And someone tell me, why 12875 is not de-graded instead of 12801. Even 12875 TT is slower, already having too much halts in central UP due to which its Avg speed is too slow to qualify as SF. Even its priority is too poor having SF category
Translate to English
Translate to Hindi

4214 views
1

Today (14:24)
PrakharYadav^~
PrakharYadav^~   13170 blog posts
Re# 6093763-2               Past Edits
UPDATE : /blog/post/6099799
Translate to English
Translate to Hindi
Info Update
14134 views
8

Yesterday (22:16)   HQR/Hirenanduru (2 PFs)
Exynos9611~
Exynos9611~   15878 blog posts
Entry# 6099388            Tags  
5 compliments
Great Useful Useful Useful Useful
Source Gm Cr X Handle

Congratulations to Team Solapur for successfully commissioning the Siemens (Westrace)-MK-II Electronic Interlocking at Hirenanduru station in the Solapur division!
This milestone brings enhanced safety and reliability to our operations
Translate to English
Translate to Hindi

5366 views
0

Today (11:51)
krnt_vskp_express~
krnt_vskp_express~   5710 blog posts
Re# 6099388-1              
How does it differ to normal interlocking?
Translate to English
Translate to Hindi
Info Update
33131 views
22

★★★
Jun 13 (11:26)   12201/Mumbai LTT - Kochuveli Garib Rath Express (PT)
Exynos9611~
Exynos9611~   15878 blog posts
Entry# 6093831            Tags  
3 compliments
Great Great Great
Finally
Translate to English
Translate to Hindi

5 Posts

21120 views
0

Jun 13 (18:14)
Harsha_12627^~
Harsha_12627^~   5212 blog posts
Re# 6093831-6              
Ypr kcvl also will be lhb fied soon
Translate to English
Translate to Hindi

14412 views
2

Jun 17 (19:09)
KaveriMail~
KaveriMail~   845 blog posts
Re# 6093831-7              
5 seater AC Chair Car (CC) has only 78 seats compared to 3A which has 80 or 3E which has at least 83 berths. So, not a great move in my opinion since Kerala has plenty of intercity trains plying during the day.

The old 6-seater Garib Rath AC Chair Car coach had 100+ seats, that did accommodate more passengers, though not as comfortable.
Translate to English
Translate to Hindi

7754 views
0

Today (09:12)
Exynos9611~
Exynos9611~   15878 blog posts
Re# 6093831-8               Past Edits
what will tvc division do with ltt kcvl icf grs rakes
Translate to English
Translate to Hindi

6643 views
1

Today (09:35)
Aidanus~
Aidanus~   53 blog posts
Re# 6093831-9              
The rake is of TVC div not PGT.
Translate to English
Translate to Hindi

6075 views
1

Today (10:18)
irifan2015~
irifan2015~   2417 blog posts
Re# 6093831-10              
Rake is of TVC.
They can plan a tri weekly between TVC and SBC, in such a way that train operates from TVC end on Sundays and SBC end on Fridays. Will take care of extra week end crowd.
TT as per me:
TVC 1515 ERN 1930 CBE 0005 SA 0230 TPT 0400 KJM 0700 and terminate at YPR/ YNK/ BNC.
...
more...

Return: Start at 1830 KJM 1900 ERN 0500 TVC 0930.
Trailing TVC MAS Mail one way and in SMVB KCVL slot on return.

Translate to English
Translate to Hindi
Info Update
53830 views
6

Feb 14 (22:21)   12369/Kumbh Express (PT) | CRJ/Chittaranjan (3 PFs)
animesh^~
animesh^~   2892 blog posts
Entry# 5969868            Tags   Past Edits
1 compliments
Useful
New Stop
Translate to English
Translate to Hindi

10 Posts

20536 views
0

Mar 06 (21:06)
StarcAndRussellWillDefeat
StarcAndRussellWillDefeat   1680 blog posts
Re# 5969868-11              
there is only 3 trains to HW from Kolkata -- 12327/28, 12369/70 & 13009/10. only 13009/10 stops BWN & DGR & is very slow
Translate to English
Translate to Hindi

19188 views
1

Mar 07 (12:18)
animesh^~
animesh^~   2892 blog posts
Re# 5969868-12              
In my view DGR and BWN should have halts of all the SF/express trains running via that route. What’s the point of skipping main stops and stopping at irrelevant stops.
Translate to English
Translate to Hindi

19050 views
0

Mar 07 (12:19)
animesh^~
animesh^~   2892 blog posts
Re# 5969868-13              
Lots= 13009/10 ONLY.
Translate to English
Translate to Hindi

3842 views
0

Today (10:04)
SonuSharma~
SonuSharma~   2975 blog posts
Re# 5969868-14              
ER train having no halt at ER one of major stations like bwn durgapur
Translate to English
Translate to Hindi

3908 views
0

Today (10:05)
SonuSharma~
SonuSharma~   2975 blog posts
Re# 5969868-15              
Agree all the existing sf and rajdhani duronto which skip these should halt at bwn durgapur as deserving stations as IR always ignore
Translate to English
Translate to Hindi
Page#    63330 Blog Entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy