Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Vaigai வந்துருச்சு, ஆசையில் ஓடி வந்தேன்

Search Forum
Filters:
Page#    419435 Blog Entries  next>>
General Travel
2365 views
0

Today (18:22)   14603/Saharsa - Amritsar Jansadharan Express (Via Sirhind) (UnReserved) | GKP/Gorakhpur Junction (10 PFs)
IndianRailFan
IndianRailFan   121 blog posts
Entry# 6044757            Tags  
Is train me Hybrid-LHB Rake remove kar Diya gya hain plz moderator change LHB Rake. Ye train LHB Rake ke sath Chal rahi hai is train me kal hi Journey Kiya tha
Translate to English
Translate to Hindi

430 views
0

Today (19:12)
K.K.^~
K.K.^~   160605 blog posts
Re# 6044757-1              
pics please
Translate to English
Translate to Hindi
General Travel
167365 views
15

★★
Apr 03 (19:36)   13351/Dhanbad - Alappuzha Express (PT) | DHN/Dhanbad Junction (9 PFs)
The_unknown_rail
The_unknown_rail   32 blog posts
Entry# 6018017            Tags   Past Edits
2 compliments
Great Great
Proposal for extension of 13351/52 Dhanbad - Alappuzha Express upto Kochuveli
Translate to English
Translate to Hindi

28 Posts

27171 views
0

Apr 20 (22:08)
RFIR~
RFIR~   6835 blog posts
Re# 6018017-29              
Very difficult to change the TT of these long dist trains because of path availability & other constraints.
Translate to English
Translate to Hindi

2861 views
0

Today (18:33)
Arnab_K~
Arnab_K~   9043 blog posts
Re# 6018017-30              
It was originally BKSC-MAS express with a slip service from TATA if I am not mistaken. Originally a SER train, due to ADRA division's apathy towards the pitline at BKSC, it wasn't looked after well and allowed to rot away. The Primary maintenance of this train was then given to ER and the train was extended to DHN_ER and the train was renumbered to 13351.

BKSC is a strange case where a combination of several factors have ensured that a city of the calibre of Bokaro is devoid of originating/terminating trains.
...
more...

Be it the land issue with BSL that denies the justified increase in number of platforms at BKSC, or the general apathy of SER and ADRA division towards it as a whole. Compounding this problem is the weak political lobby of Dhanbad, under whose Union Legislative seat BKSC lies.

Dhanbad got lucky in some ways, the location was good and ER's ASN Division, and then Dhanbad Division was really beneficial for the region. Dhanbad and Gomoh got pitlines for that reason.

Dhanbad still gets a lot of benefits from ASN Division, that is a undisputed fact. That is the main reason why I always felt that DHN Division shouldn't have be created out of ASN Division in the first place. It would still be beneficial if DHN was reinstated back into ASN.

I have tagged members from BKSC, who will be able to elaborate on the matter in greater details.

Translate to English
Translate to Hindi

608 views
0

Today (19:08)
PiyushSrivastava^~
PiyushSrivastava^~   20305 blog posts
Re# 6018017-31               Past Edits
Link to blog post: /blog/post/5704908
It was 89/90 TATA-MAS originally (1970 introduction), going via Bhimavaram Town then, departing Tatanagar at night. The whole rake got extended to BKSC in 1975, via Muri. In 1981, the train was split up into two parts, 89/90 BKSC MAS and 89A/90A TATA MAS. BKSC MAS (evening departure) became the main train and TATA MAS (night departure) became the link. BKSC MAS ran via Ranchi-Hatia and TATA MAS via Chakradharpur, and got attached at Rourkela.

From
...
more...
1981, after split, train started going via Eluru, which 13351/52 continues to date. In 1991, Railway Minister C.K. Jaffer Sharief extended the train to Alleppey, and the slot changed. Noon departure from Bokaro for 8689 and evening departure for 8189 from Tatanagar. In 1995, train was rerouted via Perambur, avoiding reversal at MAS.

Railway Minister Nitish Kumar extended the Bokaro train to Dhanbad via DC line in 2003.

Translate to English
Translate to Hindi

512 views
0

Today (19:11)
ady_rajat^~
ady_rajat^~   10711 blog posts
Re# 6018017-32              
Just one correction, 8689/90 BKSC - ALLP Express got extended to DHN circa 2002-03. It was already under ECR, then.

You have more or less listed(almost all) problems pertaining to the present state of BKSC. All terminating/originating trains of BKSC were lost to other nearby stations. 8689/90 BKSC - ALLP was extended to DHN, 2019/20 HWH - BKSC Shatabdi got extended to RNC, and the last one HWH - BKSC Passenger/Express got extended to RNC indirectly through its RSA partner BKSC - RNC Passenger.
...
more...

The pitline at BKSC is in a very bad state now(it is damaged). At this time, when the Government is investing so much in infrastructures, it's very sad to see the state of railway station of a prominent industrial town in the state of Jharkhand. Bokaro Steel City deserves a lot better.

Translate to English
Translate to Hindi

512 views
0

Today (19:11)
PiyushSrivastava^~
PiyushSrivastava^~   20305 blog posts
Re# 6018017-33              
Please refer to /blog/post/6018017 for detailed history of this train.
Translate to English
Translate to Hindi
General Travel
114267 views
4

Mar 12 (18:52)   12760/Charminar Express (PT) | MS/Chennai Egmore (11 PFs)
abdulrazzak123
abdulrazzak123   42 blog posts
Entry# 5995403            Tags   Past Edits
Soon Charminar Express will be till NCJ via- Chordline waiting for the approval from RB IR

3 daily running trains to Chennai
12603/04- MAS-CHZ-MAS
17651/52- KCG-PDY/CGL-KCG
12759/60-
...
more...
HYB-NCJ-HYB(soon till NCJ)

How can a single train carter the complete load to Chennai introduction of another new daily train or a VB from MAS-SC-MAS is badly required

Translate to English
Translate to Hindi

3 Posts

17718 views
0

Mar 20 (11:34)
Boxerbhai_432~
Boxerbhai_432~   12021 blog posts
Re# 5995403-4              
Do u have full pdf
Translate to English
Translate to Hindi

11022 views
0

Mar 26 (19:46)
Venky97
Venky97   3 blog posts
Re# 5995403-5               Past Edits
Instead 22715 KCG Madurai SF Can be extended or 16353 Kacheguda Nagercoil express frequency can be increased , but why targeting Charminar SF Express?
Translate to English
Translate to Hindi

2690 views
0

Today (16:10)
abdulrazzak123
abdulrazzak123   42 blog posts
Re# 5995403-6               Past Edits
Both of them are useless and they run with worst timings in worst route

The demanded route is Via-NCJ, TEN, Virudhunagar, MDU, Dindigul, TPJ, TJ, Kumbakonam, MV, CDM, VM, Take any route from VM till VM if Chordline is also fine but don't take the train via-Karur, Namakkal which is of no use it will be only helpful for SA, ED people only they demand is between VM and TPJ stretch
Translate to English
Translate to Hindi

1485 views
0

Today (18:15)
deepak.yerr~
deepak.yerr~   6054 blog posts
Re# 5995403-7              
What about Hyderabad Chennai travellers? There are 30 buses running equal capacity of a train. There is no new train between those cities in past 10-12 yrs and all 3 trains run with WL for a week and require additional capacity of extra coach in each class which is itself equal to full length train. SR or SCR need to add one more take to extend to NCJ instead SR should ha e made a proposal for 4 days a week train Biweekly via Tanjavur and Biweekly via Vridhachalam VPM KPD RU to Kacheguda with PM at NCJ at night with morning dep at Nagercoil to arrive morning in Hyd.
Translate to English
Translate to Hindi

617 views
0

Today (19:08)
abdulrazzak123
abdulrazzak123   42 blog posts
Re# 5995403-8              
don't think RB is foolish there is bi-weekly or 4 day weekly new train to be introduced from SC via-MS,CDM,MV till RMM which is going to be the last train for SC and MS
Merging of 12705/06 with Vijayawada Chennai JanaShatabdi and to run as SC MAS ICE express and along with this one VB is proposed to be operated from MAS SR division to SC

...
more...
these are the 3 more thing will be given along with Charminar extension nothing offensive even i hate sending it down south but Hyderabad is have worst connectivity than any other cities

Translate to English
Translate to Hindi
General Travel
12519 views
12

★★
Today (14:02)   UDL/Andal Junction (6 PFs)
S_Bannerjee~
S_Bannerjee~   166 blog posts
Entry# 6044609            Tags   Past Edits
6 compliments
Useful Useful Useful Useful Great Useful
A new Andal bypass line is under construction near Bakhtarnagar cabin. The line on far left is the new line.
Translate to English
Translate to Hindi

7 Posts

3217 views
1

Today (18:13)
Arnab_K~
Arnab_K~   9043 blog posts
Re# 6044609-8              
1 compliments
Agree
Not just for ASN, I think this will open up new connectivity options for DHN-ASN belt with SURI,RPH,PKR,SBG,MLDT.
Also scopes improving connectivity between places in Northern Jharkhand like Rajmahal and Sahibganj with state capital Ranchi.


Intercity
...
more...
trains amongst the aforementioned places will be helpful

Translate to English
Translate to Hindi

2671 views
1

Today (18:27)
ady_rajat^~
ady_rajat^~   10711 blog posts
Re# 6044609-9              
1 compliments
Agree
Yes, you are correct. Who knows, we might see a ANVT/DLI - RPH/MLDT Express via - DHN or RNC - NJP Express restoration via - ASN, RPH, PKR, MLDT.

IMO, one more bypass should be constructed joining Down main line of SBG loop with UP main line of HWH - ASN main line. This would ensure trains coming from RPH/BHP side to move seamlessly towards DGR/ASN.
Translate to English
Translate to Hindi

1991 views
1

Today (18:40)
Arnab_K~
Arnab_K~   9043 blog posts
Re# 6044609-10               Past Edits
1 compliments
Agree
Yes adding a extra RORO service at the Khana link cabin to the UP slow line in the BWN-ASN section, would definitely bolster connectivity with Shantiniketan area with the Shipanchal area.

Another thing that has to be done ASAP is the alternate DC line being built quickly so that the train services between DHN & RNC can be seamless and increased in load. The existing line is on it's last leg and more and more services are being introduced on this line.
...
more...

New trains like JSME-VSG and the existng running trains on the DC line are running at a great risk, and the expected date of completion of the reallignment i.e 2027 might be a bit too late I am afraid. Who knows whether the existing DC line may survive for that long...

Translate to English
Translate to Hindi

1241 views
0

Today (18:50)
ady_rajat^~
ady_rajat^~   10711 blog posts
Re# 6044609-11               Past Edits
New alignment for the DC line should be the top most priority of RB.
Translate to English
Translate to Hindi

1046 views
0

Today (18:52)
navi_fan_2142~
navi_fan_2142~   987 blog posts
Re# 6044609-12              
For the new DC line, bypass at GMO is being considered. But the main bottleneck is the river bridge near CRP, which slows trains down considerably.
Translate to English
Translate to Hindi
General Travel
1636 views
3

Today (18:51)   GAYA/Gaya Junction (10 PFs)
Dhanbad_railway~
Dhanbad_railway~   49 blog posts
Entry# 6044770            Tags   Past Edits
2 compliments
Great Great
First train between Gaya and Yesvantpur (Bengaluru) 🎉🔥
Translate to English
Translate to Hindi
Page#    419435 Blog Entries  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy