Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Amarkantak Express: Holy for Railfans as holy as Amarkantak is for devotees. - Ayan G

Search Forum
Filters:
Page#    420032 Blog Entries  next>>
General Travel
171 views
0

Today (08:45)   15549/Jaynagar - Patna Intercity Express
unique_abhii
unique_abhii   46 blog posts
Entry# 6056752            Tags  
Why too much extreme slack in this train between hajipur to patna?? Almost 2 hrs 25 min taken to cover the distance of only 33 km with average speed of 13 km/hr. Why people use this train while simply by road a person reached patna within half an hour and save 2 hrs....
Translate to English
Translate to Hindi

0 views
0

Today (08:50)
Shrivastavkranti2393
Shrivastavkranti2393   273 blog posts
Re# 6056752-1              
Slack. Aur rassta v thoda constrain hai beech main do nadi h single line hai ppta se pws. Main line mein entry se phle wait karti h train isiliye
Translate to English
Translate to Hindi
General Travel
830 views
2

Today (08:30)   12871/Howrah - Titlagarh Ispat Express | SBP/Sambalpur Junction (4 PFs) | SRC/WAP-7/30687
AdityaSharma077~
AdityaSharma077~   470 blog posts
Entry# 6056745            Tags   Past Edits
1 compliments
Great
The 12871 / 12872 & 22861 / 22862 Ispat Express is a Superfast day train of Indian Railways connecting Kolkata with Titlagarh & Kantabanji. It covers a distance of 741 kilometers at an average speed of 57 km/h (35 mph). This Train Started it's Service almost 47 years ago 15 August 1976
Translate to English
Translate to Hindi
General Travel
19287 views
14

★★
Yesterday (11:17)   12789/Kacheguda - Mangaluru Central SF Express (PT) | DHNE/Dhone Junction (5 PFs) | BZA/WAP-7/39163
Udayappa~
Udayappa~   2022 blog posts
Entry# 6055930            Tags   Past Edits
1 compliments
Great

3 pics

The biweekly Mangaluru bound Superfast Express from Kacheguda in a circuitous route, hauled by WAP - 7 numbered 39163 from Vijayawada, arrives 30 minutes ahead of its scheduled time at Dhone Jn....
Translate to English
Translate to Hindi

4 Posts

11386 views
4

Yesterday (16:19)
Tapan Sharma^~   1549 blog posts
Re# 6055930-5              
1 compliments
Agree
SWR denied to run via ghats and SR has agreed for the long route benefitting the stations enroute hence goes via Coimbatore, Kasaragod.
Translate to English
Translate to Hindi

9276 views
2

Yesterday (17:44)
deepak.yerr~
deepak.yerr~   6120 blog posts
Re# 6055930-6              
1 compliments
Agree
All trains Manguluru via Shoranur are primarily to serve Coimbatore Khozikode Kannur which give max occupancy and Manguluru is only a terminal for end to end traveller. This train serves Manguluru public to Tirupati as good overnight in both directions. SWR should give one slot in Hassan Shiradi Ghat section so that SCR and SR operate a Biweekly train sharing the slot.
Translate to English
Translate to Hindi

8767 views
1

Yesterday (17:59)
Udayappa~
Udayappa~   2022 blog posts
Re# 6055930-7              
It is serving North Kerala and it is dumped at MAQ. except for KPD and SA other main places are at untime at TN. do proper research before commenting.
Translate to English
Translate to Hindi

8632 views
1

Yesterday (18:02)
Udayappa~
Udayappa~   2022 blog posts
Re# 6055930-8              
Yes. SWR should give slots for other destinations as well from Mangaluru side. As far as this train is concerned hardly it is having any bookings to mangaluru. Yes for tirupati it could be beneficial but still i wonder if there is any bookings till MAQ. SR should consider developing KGQ/CAN as a terminal with primary maintenance facilities and avoid dumping all the trains all the way to MAQ
Translate to English
Translate to Hindi

740 views
0

Today (08:28)
Tapan Sharma^~   1549 blog posts
Re# 6055930-9              
Yeah Deepak ji, although we have long route the E-E, passengers for CBE , PGT and SRR too got an alternate connection from HYD apart from Kongu (until CBE) and Sabari. Ideally one slot via Hassan has to be given. Ideally this train was proposed via HAS now all we can do is to hope for. Unless we have some strong intervention from any MP's turning this into reality is little difficult.
Translate to English
Translate to Hindi
General Travel
2674 views
1

Today (07:10)   12368/Vikramshila Express (PT)
AmitJha^~   18302 blog posts
Entry# 6056714            Tags  
1 compliments
Agree
last 10 days se 12368 DDU RT aati hai.. aur fir ARA se PNBE ke bich delay ho jati hai. agar PNBE RT aayi to aage PNC ya BKP tak me 2hr tak delay ho jati hai. mid night me aisi kya problem ho Jaa rahi hai route me daily.. koi kaam chal raha hai kya track par?
Translate to English
Translate to Hindi

2230 views
0

Today (07:20)
VedantKumar_Biharsharif_P~
VedantKumar_Biharsharif_P~   6502 blog posts
Re# 6056714-1              
I also don't know, may be some simultaneous signaling failures or I think congestion due to special trains.
Translate to English
Translate to Hindi

1048 views
0

Today (07:53)
Kanhawrs~
Kanhawrs~   120 blog posts
Re# 6056714-2              
Every day singal issu nhi hona chahiye. DDU se KIUL /KIUL se DDU tak iska SF ka value nhi h sayad isi wajah se isko side karke dusre SF train ko nikal deta h kyoki same time me dusari train direct pass kr rhi h
Translate to English
Translate to Hindi

472 views
1

Today (08:26)
RCBian
RCBian   48 blog posts
Re# 6056714-3              
1 compliments
Agree
Block ke karan controlled manner mein chal rahi Danapur division mei
Translate to English
Translate to Hindi
General Travel
897 views
0

Today (08:16)   01065/Mumbai CSMT - Agartala Special Fare Summer Special
Rajesh~
Rajesh~   2348 blog posts
Entry# 6056743            Tags  
Why IR is running special trains with too much delays. Now a days most of the special trains are running with minimum delay of 12hrs. But this train is creating record by running late by 37hrs
Translate to English
Translate to Hindi

647 views
2

Today (08:21)
harshityadav~
harshityadav~   1286 blog posts
Re# 6056743-1              
1 compliments
Great
04227 LTT BSB sustained its 2.5 hrs delay from start till the end and reached BSB 2.5hrs late only.

Had tracked many summer special trains, but found this one to be most punctual.
Translate to English
Translate to Hindi
Page#    420032 Blog Entries  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy