Search Forum
Blog Entry# 1011670
Posted: Mar 02 2014 (12:03)
3 Responses
Last Response: Mar 02 2014 (21:43)
3 Responses
Last Response: Mar 02 2014 (21:43)
this train should be extended upto guntakal......i think guntakal is not in much accesibility to hyb as it should be....
Hundry should extend upto Guntakal, becz it will stay from 9.30pm to 6am at KRNT, instead it can prepone to15.45hrs the dept time at SC and dept time at GTL should be 4.30am...so that it can reach KRNT by 7am and will reach SC as scheduled arr time 10.45am.
yes more better.....but I think the whole journey from sc-gtkl can be covered in 7 hrs with avg speed of 47kmph which is a not so bad speed in this section..