Search Forum
Blog Entry# 1055966
Posted: Apr 13 2014 (12:18)
16 Responses
Last Response: Apr 14 2014 (09:31)
16 Responses
Last Response: Apr 14 2014 (09:31)
When SR changing loco in madurai for al trains nearly 10 trains it takes more than 20 min.......Instead All zones can try this that when trains entering jn with diesel loco the elecetric loc can be stand at end of platform when train reached platform the diesel loco can be made off and AC loco can take charge and carrying the trains with the dead Diesel loco on both sides............
12 Posts
then y TVC NCJ got diesel?
after SCT Punalur opens what will happen to MDU punalur passenger?
after SCT Punalur opens what will happen to MDU punalur passenger?
Sir in some electrified stretches Diesel monsters also given works sir....EG Pondicherry chennai pass with TNP WDM