Search Forum
Blog Entry# 1072664
Posted: Apr 26 2014 (17:39)
6 Responses
Last Response: Apr 26 2014 (21:40)
6 Responses
Last Response: Apr 26 2014 (21:40)
1 Posts
Let the Shed be built up first then they might decide as per the requirement...
Let the line be electrified first. IT will take couple of years more for WADI-PUNE line to be electrified,after which DD will be getting electric locos.
Not so soon. will take more time. the route needs to b electrified/Doubled, then one can expect ELCOS.