Search Forum
Blog Entry# 1075904
Posted: Apr 29 2014 (10:48)
6 Responses
Last Response: Apr 29 2014 (12:35)
6 Responses
Last Response: Apr 29 2014 (12:35)
A View of platforms 3,4,and 5 from the pedestrian over bridge.
The building in the far end of the right holds all the technical offices and also Asst. Station Manager or the controllers the room.
The second over bridge seen in this is sparingly used and if you zoom you can another over bridge which directly connects the goods yard with parking lot which is directly outside the railway station.
The building in the far end of the right holds all the technical offices and also Asst. Station Manager or the controllers the room.
The second over bridge seen in this is sparingly used and if you zoom you can another over bridge which directly connects the goods yard with parking lot which is directly outside the railway station.
5 Public Posts - Tue Apr 29, 2014
Ohh..now I got... this maintenance work is going for strengthening of MMR-MUE section to support 100-120 kmph speed. This came in news also.