Search Forum
Blog Entry# 1080964
Posted: May 02 2014 (15:09)
7 Responses
Last Response: May 02 2014 (20:22)
7 Responses
Last Response: May 02 2014 (20:22)
CR proposes new ROTEGAO-KOPARGAON Chord line to rly. board instead of ROTEGAON-PUNTAMBA Rly line.
If this happens, it will be soon Kopargaon Jn.
If this happens, it will be soon Kopargaon Jn.
2 Posts
Sir railways want to avoid bridge on Godavari, thats why rotegaon-puntamba not happened. Instead rotegoan-KPG. Aurangabad and shrirampur are opposite side of godavari thats why it wont happen also.
If you calculate the revenue(tourism, save in fuel etc...) that could be earned by connecting two important places than connecting two not known places just for reducing travel travel time, it is more profitable to built a bridge across godavari..
and the track can be alinged such that it cross godavari alone and not pravara., the width of godavari upto pravara - godavari sangaman is not more than 300m at any stretch considering Godavari is 2 km in RJY
and the track can be alinged such that it cross godavari alone and not pravara., the width of godavari upto pravara - godavari sangaman is not more than 300m at any stretch considering Godavari is 2 km in RJY