The electrification of Shoranur-Mangalore railway line will be completed by December 2015. As per the railways' schedule, the electrification of the stretch between Shoranur and Kozhikode will be over by December 2014 and that of the remaining stretch will be completed in another year.
click here
click here
Not possible to complete 2015 December.. Can clt stretch works are very slow..