Search Forum
Blog Entry# 116139
Posted: Feb 25 2011 (10:02)
6 Responses
Last Response: Feb 25 2011 (10:26)
6 Responses
Last Response: Feb 25 2011 (10:26)
how will the railways keep control on traffic.in every budget on an average 70-80 trains r introduced.dont u think one day all railway sections will be messed up.it also affects the speed of superfast trains.ur views on this??
1 Posts
in 70 trains there is only 15 to 20 trains run daily all other train run in some existing train time slot all remain train run weekly or bi weekly.there is possibilty to run evry 30 minute diffrence on double line track
u can check mumbai surat line train run one by one very low time diffrence line is buisy than mumbai pune line and ndl jhs line
public need train
please check surat varanasi availibility in feb to openig date of may u can not find any single confirmed ticket even rac WL goes up to 800-900
also bl varanasi spl train was full within 5 minute of openibg bookin for summer train was fulled in just 5 min
please check surat varanasi availibility in feb to openig date of may u can not find any single confirmed ticket even rac WL goes up to 800-900
also bl varanasi spl train was full within 5 minute of openibg bookin for summer train was fulled in just 5 min
but kalyan is the busy station in india connected with CST & LTT terminals in oneside and manmad, pune otherside . But surat route connected to mubai central terminus only (may be). Traffic maintanence becomes complex at junction points comparetevly with junction free track.