Search Forum
Blog Entry# 1169687
Posted: Jul 24 2014 (10:25)
9 Responses
Last Response: Jul 24 2014 (16:14)
9 Responses
Last Response: Jul 24 2014 (16:14)
Jul 24 2014 (10:25) 22451/Bandra Terminus - Chandigarh SF Express
superfast1111
superfast1111 389 blog postsWhy does Indian Railways run the 491 km electrified BDTS - ADI route with a diesel engine.
1 Public Posts - Thu Jul 24, 2014
To save 20 mins required for loco change at ADI. Shortage of Electric Engines at BRC. Shortage of Platforms at ADI(Since it has to halt for 20 mins for a loco change).
7 Public Posts - Thu Jul 24, 2014