Search Forum
Blog Entry# 1169985
Posted: Jul 24 2014 (16:02)
12 Responses
Last Response: Aug 20 2014 (20:13)
12 Responses
Last Response: Aug 20 2014 (20:13)
Jul 24 2014 (16:02) 22110X/Hazrat Nizamuddin - Mumbai LTT AC SF Express
![](http://st.indiarailinfo.com/images/1.png)
Pratik~
Pratik~ 5604 blog posts22110 up Nizamuddin- Lokmanya Tilak Terminus Express moving towards Kalyan Jn after taking a 5 min unscheduled halt in the ex-neutral section at the outer.
Trains manages a good speed on down track as 22109 but dont know what goes wrong while on up track right from Gwalior/Jhansi upto Kalyan.
If it's made to overtake few trains like Goa Express mainly without disturbing thier timetable, ontime arrival at LTT could be possible.
Trains manages a good speed on down track as 22109 but dont know what goes wrong while on up track right from Gwalior/Jhansi upto Kalyan.
If it's made to overtake few trains like Goa Express mainly without disturbing thier timetable, ontime arrival at LTT could be possible.
2 Public Posts - Thu Jul 24, 2014
4 Public Posts - Fri Jul 25, 2014
Yes... it is very much possible...Goa has a small slack between AGC and GWL which it mostly uses at Bhandai loop for Overtake by Raj. All Controllers have to do is not to disturb d sequence till AGC and let AC be ahead of Raj and give timely clearance to GR which ensures an in time arrival of AC at AGC.
Now Goa waits at Bhandai till almost 18:15 hrs for Raj OT (20 mins loop approx) which is sufficient for AC n then Raj to OT...
more...
Now Goa waits at Bhandai till almost 18:15 hrs for Raj OT (20 mins loop approx) which is sufficient for AC n then Raj to OT...
more...
4 Public Posts - Fri Jul 25, 2014
1 Public Posts - Wed Aug 20, 2014