Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Malgudi Express: From the pages of RK Narayan to the railway tracks of Mysore. - Vageesh

Search Forum
<<prev entry    next entry>>
Blog Entry# 1186712
Posted: Aug 13 2014 (17:22)

20 Responses
Last Response: Aug 13 2014 (18:25)
General Travel
8674 views
0

Aug 13 2014 (17:22)   07319X/SSS Hubballi - Hyderabad Special Fare Special
 
KoushikPatel~
KoushikPatel~   2090 blog posts
Entry# 1186712            Tags   Past Edits
In order to increase its patronage and to make it a profitable one, SWR should speed it up, it can easily be speeded up as UBL-HOTGI section has very less trains and further the route is fast track.. (MAS-CSTM),
It should leave UBL at same time 20.50 but can reach Sc at 10:00 am..
Translate to English
Translate to Hindi

15 Posts

5552 views
0

Aug 13 2014 (18:09)
KoushikPatel~
KoushikPatel~   2090 blog posts
Re# 1186712-16              
no sir,, HCPV is attached but also it remains 23 coacher.. I hav seen very rarely been 24 coacher, that too when Inspection car is attached at rare end
Translate to English
Translate to Hindi

5796 views
0

Aug 13 2014 (18:11)
sumanth chowdary   3914 blog posts
Re# 1186712-17              
Oh....may be they reduced HCPV vans
When i was staying at UBL 2 years back it will have 1Ref van,3HCPV and 5GEN coaches for 8047 apart from 8SL and 2 AC coaches and 4 Slip coaches
Translate to English
Translate to Hindi

5523 views
1

Aug 13 2014 (18:13)
KoushikPatel~
KoushikPatel~   2090 blog posts
Re# 1186712-18              
yaa, U can hardly find 1 or max 2 HCPV(occasionally),,, in the beginning this train was attached with many HCPVs
Translate to English
Translate to Hindi

5702 views
0

Aug 13 2014 (18:19)
Aproop~
Aproop~   2464 blog posts
Re# 1186712-19              
Even now, this train doesn't reach SC before 12.15 hrs!! so can't be Speeded up. S.C.R may not agree
Translate to English
Translate to Hindi

5411 views
0

Aug 13 2014 (18:25)
KoushikPatel~
KoushikPatel~   2090 blog posts
Re# 1186712-20              
but if they study the issue, they can.. it doesn't hav tight TT.. its very flexible enough
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy