Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Money is nothing; RailFanning is Everything

Search Forum
<<prev entry    next entry>>
Blog Entry# 1219323
Posted: Sep 20 2014 (07:44)

1 Responses
Last Response: Sep 20 2014 (08:16)
General Travel
1868 views
1

Sep 20 2014 (07:44)   YNK/Yelahanka Junction (5 PFs)
 
guest   439 blog posts
Entry# 1219323            Tags   Past Edits
Gooty-Yelahanka Railway Line Electrification works likely to be completed by March 2015
बेंगलुरू Bangalore (SBC): Electrification of the Yelahanka–Dharmavaram–Gooty railway line (306 km), which could offer faster and comfortable journey to the north from Bangalore besides saving on the fuel bill for the Railways, is likely to be completed by March 2015.
Rail Vikas Nigam Ltd. (RVNL), which is executing the project since 2011–12 has completed the overhead equipment (electric cables) work in two years. However, the electrified line is yet to be commissioned as power transmission companies of Andhra Pradesh and
...
more...
Karnataka are yet to execute their parts of work.
RE Works on SWRResponding to an RTI application, RVNL informed that the work on overhead equipment was complete except for a 2-km stretch on which power lines of Transmission Corporation of Andhra Pradesh Ltd. (APTRANSCO) have passed through. Despite making payments to APTRANSCO in December 2012, the company is yet to shift the lines, it said.
At the same time, APTRANSCO and Karnataka Power Transmission Corporation Ltd., (KPTCL) have to install transmission lines from grid sub-station to four traction sub-stations catering to the electrified line, RVNL said. It has made payments to the two companies. RVNL expects that shifting of lines and installation of new lines to the traction sub-stations could be completed by December this year while the mandatory inspection by the Commissioner of Railway Safety could be done by March 31, 2015.
Considerable savings
It is said that the commissioning of the line could save considerable journey time as at present diesel locos hauling Rajdhani and Sampark Kranthi express trains from Bangalore are replaced with electric locos at Secunderabad. An electric loco right from Bangalore would mean saving of at least 30 minutes and reduced environment pollution, he said. An electric loco could run up to 160 km an hour and its maintenance cost is lesser than that of a diesel loco.
A senior official in the operations division of South Western Railway said they preferred electric locos to diesel ones for the former’s efficiency.
click here

Translate to English
Translate to Hindi

1318 views
3

Sep 20 2014 (08:16)
KrisGopal^~
KrisGopal^~   19013 blog posts
Re# 1219323-3              
Mr Bhaskar: Thanks for sharing.There is a dedicated News forum for posting such news./news
Please delete the post here and post the same in the News forum.
Thanks
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy