Oct 23 2014 (12:36) CLT/Kozhikode Main (Calicut) (4 PFs)
![](http://st.indiarailinfo.com/images/1.png)
SubawaranaKohilan^~
SubawaranaKohilan^~ 7831 blog postsElectric Train to Run Upto CLT from SRR by December 2014...
Pic Credits-Mcpnbr Cannanore
Pic Credits-Mcpnbr Cannanore
2 Posts
According to the news, the final round of inspection in SRR- CLT section is over. In this inspection, the height of line, separation distance between two lines were checked.
The final trial run is expected to be run on Dec.
The CLT-CAN section might be completed by the end of next year.
The final trial run is expected to be run on Dec.
The CLT-CAN section might be completed by the end of next year.
Nothing happening between CAN-CLT.... If this progress goes on may be we can postpone the target to next dacade ......
ofcourse, once electrification gets over 12075 will be running with waps till clt. this will help in reducing time needed for loco change. Many trains loco change will happen at CLT. Due to space constraint, guess, few will be still having it at SRR itself.