Search Forum
Blog Entry# 1300402
Posted: Dec 08 2014 (11:29)
8 Responses
Last Response: Dec 08 2014 (15:33)
8 Responses
Last Response: Dec 08 2014 (15:33)
Dec 08 2014 (11:29) 16536/Gol Gumbaz Express (PT) | S/Shrirangapattana (2 PFs) 12YEARSINIRI^~ 11515 blog posts
The Girder has arrived and the construction of girder in Kaveri south bridge has commenced.
Picture taken on Board GolGumbaz express which was horribly late by 5 hours hauled by WDG 4 12100
Date: 07-Dec-2014
Picture taken on Board GolGumbaz express which was horribly late by 5 hours hauled by WDG 4 12100
Date: 07-Dec-2014
4 Public Posts - Mon Dec 08, 2014
160 Kmph from MAS-JTJ and BWT-SBC some what easy , Lots and lots of curves exists between MYS and SBC which is the real hindrance. Some are very steep like the one in Srirangapatna , Kengeri and Nayandahalli. So its a setback for 160 Kmph. In fact Bangalore to Kengeri stretch has 28 curves in its 12 Kms. Regarding electrification , it has come to an abrupt stop , No improvement in the past 1.5 years , not even a single pole laid.
3 Public Posts - Mon Dec 08, 2014