Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

হাওড়া - বর্দ্ধমান কর্ড লাইনে যান, 130 কিমি বেগে ট্রেন যাওয়াও কালবৈশাখী ঝড়ের থেকে ভয়ঙ্কর! - Jishnu Thakur

Search Forum
<<prev entry    next entry>>
Blog Entry# 1317422
Posted: Dec 23 2014 (14:02)

2 Responses
Last Response: Dec 30 2014 (11:35)
Rail Fanning
3401 views
4

Dec 23 2014 (14:02)   CSTM/Mumbai CSM Terminus (18 PFs)
 
Ramaswamy
Ramaswamy   161 blog posts
Entry# 1317422            Tags   Past Edits
WHY DOUBLING N ELECTRIFICATION OF PUNE SOLAPUR IS IMPORTANT AND NEEDS URGENT ATTENTION?

Bhusaval and Solapur are almost equidistant from Mumbai CST. While BSL is 445 kms far from CST, SUR is 455 kms away from CST.

CST
...
more...
BSL is a double electrified line while For CST SUR, Pune SUR sector still is a single diesel section even though it is one of the major connecting link between major metros viz Mumbai to SBC / MAS / HYB. IR has till date made budget announcement s but the progress is tardy and one of the main reasons in fund allocation.

A SF train from CST to BSL requires approx. 6 hrs 05 mins min to cover the distance with an avg speed of 73 kmph including Ghats n Suburban section.

However, a SF train from CST to SUR requires approx. 7 hrs 40 mins min to cover the distance with an avg speed of only 59 kmph including Ghats n Suburban section.

I have excluded loco change time in both cases assuming that loco change won't be required once CST goes under AC wires n Pune SUR work will pick up speed n completed in next couple of Years.

With these facts I rest this case here for your views n comments. Trains can be speeded up by atleast 45 mins to 1 hour if not more in this section if doubling n electrification takes place faster.

Thanks n Regards..

Translate to English
Translate to Hindi

1281 views
3

Dec 23 2014 (14:05)
kingmaker~
kingmaker~   16979 blog posts
Re# 1317422-1              
Fund Issue
Translate to English
Translate to Hindi

1461 views
0

Dec 30 2014 (11:35)
anvitjoshi^~
anvitjoshi^~   2338 blog posts
Re# 1317422-2              
It is bound to happen as it falls in Golden Quadrilateral. It will be ready by 2016.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy