Tamluk Junction Cabin, the line towards Digha bifurcates from here (to the right side while moving towards Haldia).
Both the up and down lines from Panskura are being used for passenger/goods trains upto this point, for the time being. The doubling work upto Haldia (Durgachak) is still going on.
Date: 28th Dec, 2014
Both the up and down lines from Panskura are being used for passenger/goods trains upto this point, for the time being. The doubling work upto Haldia (Durgachak) is still going on.
Date: 28th Dec, 2014
Our 38053 Howrah-Haldia EMU is about to switch the track to its right (down line), as Tamluk Junction Cabin approaches. From here, only the old single track is being used upto Haldia. The right-most track visible in the pictures goes towards Digha.
The single electrified track upto Digha gets separated from here.
Our Haldia Local proceeds towards Keshabpur (faintly visible). The new Up line (on the left ) has already been laid and the electric posts have been constructed, which shows the pace the doubling work.