Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Shabdbhedi Express: गति इसकी शब्दों को भेदती है, पूरब को पूर्वांचल से जोड़ती है - Dr. Abhishek Rai

Search Forum
<<prev entry    next entry>>
Blog Entry# 1353010
Posted: Jan 27 2015 (18:42)

54 Responses
Last Response: Mar 04 2016 (23:58)
4 Followers
Info Update
42244 views
50

★★★
Jan 27 2015 (18:42)   CRJ/Chittaranjan (3 PFs) | KYN/WAG-9/31364
 
guest   6387 blog posts
Entry# 1353010            Tags   Past Edits
#railwayengineering
THIS BLOG IS BEING UPDATED IN EVERY MONTH AND WILL ALSO BE UPDATED IN FUTURE IN THIS MANNER so long the "Ongoing Project of 3 Phase Ac Locomotives" carried On by Center for Design and Development(C-D&D) of Chittaranjan Locomotive works in Future. (Project Updates from Jan 2015 to Sept 2015 and Targets of Oct 2015 has been shared so far in the Replies of this BLOG )
------- Some important facts taken from the Official Website of Chittaranjan Locomotive Works regarding the "Ongoing Project of 3 Phase Ac Locomotives" carried On
...
more...
by Center for Design and Development(C-D&D) of Chittaranjan Locomotive works --------
************Progress of Ongoing Projects regarding 3 Phase AC Electric Locomotives carried on by C-D&D of CLW**********
Achievements in the month of December 2014
1. 1st WAP-5 locomotive 30082 fitted with IGBT based
Traction converter, Auxiliary converter and TCN VCU of M/s. BHEL and dispatched to ELS/BRC.
2. Commissioning of 2nd set of IGBT based Propulsion system of M/s Medha completed on Loco No. 31549.
3. 1st WAG 9H locomotive 31563 with Prototype unit of IGBT based Auxiliary converter of M/s HIRECT and dispatched to ELS/GMO.
4. Field trial of M/s. Medha make Hotel Load Converter fitted in loco no. 30375 (WAP-7) completed successfully on NDLS-Kalka Shatabdi alongwith RDSO representatives.
5. IGBT based Traction converters & Auxiliary Converter provided on 13 locomotives & 14 locomotives respectively during Dec.’14 at CLW.

Targets for the month of January 2015
1. Commissioning of Hotel load converter supplied by M/s Siemens on Loco No. 30406.
2. Commissioning of Hotel load converter supplied by M/s BHEL on Loco No. 30426.
3. Commissioning of 3rd & 4th set of IGBT based Propulsion systems supplied by M/s Medha on Loco No. 31557 and 31559.
4. Finalisation of new software version for WAG9/WAP7 locomotives incorporating driver display, VCU redundancy and other reliability improvement features.
5. STRs of Auxiliary Converter, VCU & Transformer for 3-Ph locomotives to be finalized after receipt of comments from RDSO.
6. Finalisation of specification for IGBT based Traction, Auxiliary converter and VCU.
For more details of the progress of this project please visit: click here
A total number of 191(One Hunderd Ninety One)IGBT Loco turned out from CLW during the period (01.04.2012 to 31.12.2014). For all the details of these 191 3 Phase AC Electric Locomotives( Like: Serial Number, Type of the Loco, CLW No of Each Loco, Loco No of each loco,Rail Zone where allotted, Sheds where allotted, Despatch date of each loco from CLW etc) please visit the following link:
click here
Only 4 IGBT Locos are despatched from CLW prior to 01.04.2012. For details of these 4 Locos(Like: Serial Number, Type of the Loco, CLW No of Each Loco, Loco No of each loco,Rail Zone where allotted, Sheds where allotted, Despatch date of each loco from CLW etc) please visit the following link:
click here
Attached Image:
1 AJNI WAP 7 30315(CLW NO of this loco: TPP-115 Despatch Date from CLW: 30.06.12)
Source: click here
IGBT Loco Issues:
As IGBT Traction Converters used in 3 Phasers are built by three firms namely ABB, BHEL and BTIL and assembled by CLW in the 3 Phase Locomotives so the issues have been addressed to the specific firm whose "IGBT Traction Converter" is being installed in the Loco.Please see the three attached "Excel Spreadsheets" to know about the Issues regarding IGBT Locomotives(3 Phaser specially WAP7,WAG 9, WAG 9H & WAG 9i). You can see the "Comment of RDSO" against "Each Issue" addressed to "ABB"in the last column of first Excel Spreadsheet and in other two excel spreadsheets you can see the "status of the issue" and "Firm's Comment about the issue" in the last column of the Excel Spreadsheet .
Attached Excel Worksheets:
3 IGBT LOCO ISSUES WITH ABB.xls(Extracted from the Official Website of CLW)
4 IGBT LOCO ISSUES WITH BHEL.xls(Extracted from the Official Website of CLW)
5 IGBT LOCO ISSUES WITH BTIL.xls(Extracted from the Official Website of CLW)
*** Please download the "Excel Spreadsheets" for seeing the issues of IGBT Locos.
This is "A Compact Information" about 3 Phase Locos(Specially: WAP 7, WAG 9, WAG 9H & WAG 9I) presented here from the Official Website of CLW.
Thanks

Translate to English
Translate to Hindi

1 Public Posts - Wed Jan 28, 2015

1 Public Posts - Sat Feb 07, 2015

1 Public Posts - Wed Mar 04, 2015

1 Public Posts - Mon Apr 06, 2015

1 Public Posts - Tue May 05, 2015

1 Public Posts - Thu Jun 04, 2015

1 Public Posts - Sun Jul 05, 2015

1 Public Posts - Fri Aug 07, 2015

2 Public Posts - Thu Sep 17, 2015

1 Public Posts - Mon Oct 05, 2015

2 Public Posts - Fri Oct 09, 2015

15 Public Posts - Wed Oct 14, 2015

13 Public Posts - Thu Oct 15, 2015

2 Public Posts - Fri Oct 16, 2015

3 Public Posts - Tue Nov 03, 2015

1 Public Posts - Thu Nov 05, 2015

1 Public Posts - Sun Nov 08, 2015

4157 views
5

Dec 06 2015 (13:17)
guest   6387 blog posts
Re# 1353010-73               Past Edits
Position of Ongoing Project regarding 3 Phase AC Electric Locomotives carried on by C-D&D of CLW(Chittaranjan Locomotive Works)
In the last reply I described the Achievements in the month of October 2015 and Targets for the month of November 2015. In this reply I will describe the Achievements in the month of November 2015 and Targets set for the month of December 2015 :
Achievements in the month of November’15
...
more...

1. 1stWAP7 locomotive No. 30436 equipped with additional I/O cards to ensure complete VCU redundancy sent to ELS/RPM after necessary field validation/trials.
2. Pneumatic circuit on hotel load converter fitted locomotive 30445 has been modified by redesigning Aux. reservoir for better maintenance in sheds.

3. STR of transformer for 3-Ph locomotives finalized after incorporating comments from vendors.
4. Completion of filter cubicles of modified design compatible for dual hotel winding transformer.
5. Specification of composite converter for WAP-5 locomotives finalized.

Targets for the month of December’15
1. 3rd set of Alternate Drive Gear Arrangement for 160 kmph supplied by M/s Henschel/Germany to be commissioned on WAP-5 locomotive.
2. Commissioning of Hotel load converters supplied by M/s Siemens on Loco No. 30453, 30445 & 30446 alongwith 7775kVA double winding transformers.
3. Conduction of field trials on DPWCS fitted locomotives 31525 and 31526 at ELS/TATA in association with RDSO.
4. STR of IGBT based Traction Converter for 3-Ph locomotives to be finalized after incorporating comments from vendors/RDSO.
5. Release of Software modified for incorporation of fail safe mode in master controllers after field trial.
6. Complete redundancy on one more WAP-7 locomotive.
7. Revision of specification of traction and Aux. converter as per RDSO suggestions.
For more details please see: click here
Attached Image Link: click here
KALYAN WAG 9 31364(CLW NO of this loco: TG-343 Despatch Date from CLW: 26.11.12)
Source: click here
Photo taken by: Pratik12259

Translate to English
Translate to Hindi

1 Public Posts - Thu Jan 07, 2016

2 Public Posts - Tue Feb 02, 2016

2 Public Posts - Fri Mar 04, 2016
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy