Search Forum
Blog Entry# 1375755
Posted: Feb 21 2015 (12:09)
7 Responses
Last Response: Feb 21 2015 (16:21)
7 Responses
Last Response: Feb 21 2015 (16:21)
Does this train deserve LHB rake or not.
Also i think there should be a composite coach of 2ac/1ac added to this train..
Also i think there should be a composite coach of 2ac/1ac added to this train..
2 Posts
Only Ald to mgs this train takes more time or is slow otherwise no issues with speed