no work satrted after son nagar towrds gaya side for #edfc . i feel son nagar to gaya will not be made triple line
Since the rail bridge is too long , so in order to run trains smoothly the advance starter has been installed . moreover it is a signal only no cabin or station , since it is on bridge . it is not automatic signal it is controlled from DOS and SEB both sides
I agree... even the official site states that by 2019 only the Sonnagar - Kanpur stretch will become operational. They are "excluding" the Sonnagar - Dankuni section as originally proposed by Mr. Lalu Yadav's Railways Ministry era.... #EDFC without West Bengal?? :-(
this means that the advance starter will get installed in the nearly completed bridges
Ganga Rail-Road Bridge (4.55 km Long)
Munger Ganga Bridge (3.7 km Long)
Ganga Rail-Road Bridge (4.55 km Long)
Munger Ganga Bridge (3.7 km Long)
u mean this facility is installed in Vembanad Bridge
and will get installed in........
Ganga Rail-Road Bridge (4.55 km Long)
Munger Ganga Bridge (3.7 km Long)
and will get installed in........
Ganga Rail-Road Bridge (4.55 km Long)
Munger Ganga Bridge (3.7 km Long)