Search Forum
Blog Entry# 1464426
Posted: May 11 2015 (17:04)
2 Responses
Last Response: May 12 2015 (10:30)
2 Responses
Last Response: May 12 2015 (10:30)
May 11 2015 (17:04) RPJ/Rajpura Junction (3 PFs) | TKD/WAG-9H/31300
thetrainexplorer~
thetrainexplorer~ 3159 blog postsA TKD WAG9H with loaded BOXN coal towards LDH. It was made to stop as a WDG4 of SBI was bringing full loaded BOXN coal from Patiala side, (which you can see in the 2nd pic) as the RBR here intersects with main lines of NDLS-ASR.
I saw the power of WAG9, as soon as the starter was released, the LP released the brakes and notched the throttle to position 1, the rear side boggie frame, just got lowered due to load on it.