Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Amarkantak Express: Holy for Railfans as holy as Amarkantak is for devotees. - Ayan G

Search Forum
<<prev entry    next entry>>
Blog Entry# 1467698
Posted: May 14 2015 (06:46)

25 Responses
Last Response: May 19 2015 (01:12)
Info Update
11087 views
8

May 14 2015 (06:46)   DMWP/DMW Halt Patiala (1 PFs)
 
thetrainexplorer~
thetrainexplorer~   3159 blog posts
Entry# 1467698            Tags   Past Edits
Road Under Bridge or RUB work, near DMW Halt, Patiala is going to start either today or tomorrow as NRCO officials were making preliminary arrangements at the site yesterday with a huge crane lifting and assembling the precast RCC boxes at one place. A traffic block shall be imposed for 6 hrs. After this, we may bid adieu to the LC no 15 C here ...bye bye !! There is an ROB, and now RUB been constructed near this LC, as there is a lot of heavy traffic including loaded trucks on this road, the ROB was much needed, The RUB is being constructed for two wheelers etc, specially for DLMW staff.
Translate to English
Translate to Hindi

31 Posts

2966 views
1

May 19 2015 (00:22)
vijeshk_^~
vijeshk_^~   32790 blog posts
Re# 1467698-32              
Excellent Coverage of the work sir. Great effort.
Translate to English
Translate to Hindi

2806 views
0

May 19 2015 (00:25)
vijeshk_^~
vijeshk_^~   32790 blog posts
Re# 1467698-33               Past Edits
Thanks for the coverage sir, I was waiting for so many days to see it live, but my bad luck I was at ChandiGarh... :(
Soon after returned to PTA, rushed to the spot after the block was over... :-/
Translate to English
Translate to Hindi

2856 views
0

May 19 2015 (00:46)
vijeshk_^~
vijeshk_^~   32790 blog posts
Re# 1467698-34              
So, 11058 forced to wait, lolz :P
कुछ ज्यादा ही जल्दी आ गया। :P
Translate to English
Translate to Hindi

2878 views
0

May 19 2015 (00:48)
vijeshk_^~
vijeshk_^~   32790 blog posts
Re# 1467698-35              
I can see only 3-4 bolts were un track joint, besides of 6 bolts... were they in a hurry to let 11058 pass ?
Translate to English
Translate to Hindi

2628 views
1

May 19 2015 (01:12)
thetrainexplorer~
thetrainexplorer~   3159 blog posts
Re# 1467698-36              
11058 was started late from ASR at 11 am instead of 8:30am. Yes. They were in tension and in hurry as the block period was over but some track work was pending. The track was not fitting back and they had to cut 1cm of it it using gas cutter in a hurry to fit it back, and while they were doing it, 11058 was already there...
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy