May 14 2015 (06:46) DMWP/DMW Halt Patiala (1 PFs)
thetrainexplorer~
thetrainexplorer~ 3159 blog postsRoad Under Bridge or RUB work, near DMW Halt, Patiala is going to start either today or tomorrow as NRCO officials were making preliminary arrangements at the site yesterday with a huge crane lifting and assembling the precast RCC boxes at one place. A traffic block shall be imposed for 6 hrs. After this, we may bid adieu to the LC no 15 C here ...bye bye !! There is an ROB, and now RUB been constructed near this LC, as there is a lot of heavy traffic including loaded trucks on this road, the ROB was much needed, The RUB is being constructed for two wheelers etc, specially for DLMW staff.
31 Posts
Thanks for the coverage sir, I was waiting for so many days to see it live, but my bad luck I was at ChandiGarh... :(
Soon after returned to PTA, rushed to the spot after the block was over... :-/
Soon after returned to PTA, rushed to the spot after the block was over... :-/
So, 11058 forced to wait, lolz :P
कुछ ज्यादा ही जल्दी आ गया। :P
कुछ ज्यादा ही जल्दी आ गया। :P
I can see only 3-4 bolts were un track joint, besides of 6 bolts... were they in a hurry to let 11058 pass ?
11058 was started late from ASR at 11 am instead of 8:30am. Yes. They were in tension and in hurry as the block period was over but some track work was pending. The track was not fitting back and they had to cut 1cm of it it using gas cutter in a hurry to fit it back, and while they were doing it, 11058 was already there...