Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Be a RailFan; learn how to enjoy your trip; enjoy your life.

Search Forum
<<prev entry    next entry>>
Blog Entry# 1506990
Posted: Jun 10 2015 (14:08)

9 Responses
Last Response: Jun 11 2015 (11:57)
Info Update
12197 views
18

★★★
Jun 10 2015 (14:08)   BLP/Balrampur (2 PFs)
 
Ravana~   2575 blog posts
Entry# 1506990            Tags   Past Edits
#updategdbnygc
Seen here is the unimat machine lifting and fitting the track heavily at Balrampur.
just see the heat level working with gamcha on the heads.
Wo log salary ke liye garmi me kaam kr rhe aur mai social work ke liye haha.
Translate to English
Translate to Hindi

4 Posts

2176 views
0

Jun 10 2015 (19:11)
Ravana~   2575 blog posts
Re# 1506990-5              
Shruwat se hi khi 110 mps na de itna dheere dheere kar rhe haha
Translate to English
Translate to Hindi

2914 views
0

Jun 10 2015 (19:26)guest
Re# 1506990-6              
i hope GKP-ANDN-BNY-BLp-GD loop section will b a fast single line section as same as RE-CUR-BKN
Translate to English
Translate to Hindi

2010 views
0

Jun 10 2015 (20:08)
thetrainexplorer~
thetrainexplorer~   3159 blog posts
Re# 1506990-7              
Seems like those are 6 Quad Cable reels...
Translate to English
Translate to Hindi

1949 views
1

Jun 10 2015 (21:54)
Ravana~   2575 blog posts
Re# 1506990-8              
Yes they are signalling is going at full speed here
Translate to English
Translate to Hindi

7271 views
0

Jun 11 2015 (11:57)
Ravana~   2575 blog posts
Re# 1506990-9               Past Edits
SPECIFICATION SOURCE click here
The main frame of the machine is in one piece and rests on two 2-axled bogies. It is arched over the area of the work unit so that there is a full view onto the working area and sufficient space for free movement of the units.
The rear section of the machine is connected to the main frame by a pivot and rests on steering axles.
The
...
more...
solid design of the frame tasks into accounts the special requirements of the lifting and lining forces on heavy types of permanent way. The extended distance between bogie pivots also ensure a gentle bending lines and thus minimizes the lifting and lining forces needed.
The machine has three cabins and the front cabin houses all operating controls for transfer travel as well as driving and operating controls for the leveling and lining measuring unit. The ALC - automatic guiding computer – installed here enables control of the leveling and lining operations when the target track geometry data is known or, if the target track geometry is not known, measurement of the actual track geometry with subsequent calculation and optimization of the target geometry.
The work cabin directly in front of the work units is spaciously laid-out so that the operator has an excellent view onto the tamping units, the combined lifting and lining unit and the synchronous 3-rail lifting unit
The work units are operated from the two seats positioned in the cabin. It is also possible, by a simple switchover, to control all operating functions for work from one seat.
The cabin at the end of the machine provides monitoring and operating controls during transfer travel and for the sweeper unit (optional).
The machine is completely roofed over from the front cabin to the rear cabin. A gangway connects the front cabin and the work cabin. In the area between the work units there is a catwalk for assembly and serving work, which can be reached from the rear cabin. This means that along its entire length the machine is accessible from inside.
Tamping units
The four tamping units with double tilting tines are the essential feature of this machine. The outer units are mounted on telescope jibs and can be slewed out far enough that the deflecting line of the switch can also be tamped. The inner tamping units are positioned to be displaceable on vertical guide columns so that they can be applied in the area inside and outside the rails. Both the inner and the outer units can be pivoted individually to adapt to the slanting position of the sleepers.
The left-hand tamping unit illustrates the maximum displacement of the outer tamping units. The lateral range of the tamping tines is 3 200 mm from center of track. This design enables the long sleepers to be fixed in place in one pass.
In their basic position the 16 side-tilting tamping tines have the same positioning as on plain line tamping machines. This guarantees optimum maintenance of tracks as well as maintenance of the entire switch area.
Combined track and switch lifting and lining unit
This unit is proven design is positioned directly in front of the tamping units. It can be displaced by ±200 mm lengthwise along the rails. On tracks roller-lifting clamps performs the lifting. On switches the lifting hook is used which grips either underneath the rail head or rail base. During forward motion the unit adapts to the rail curvature without transmitting forces to the rail.
Synchronous 3-rail lifting
Switches and crossings are complex, heavy-duty permanent way components of high precision. No undue tensions should be transmitted to the switch in the course of maintenance. For this reason the machine is equipped with an additional lifting device for the deflecting rail.
Depending upon the design of the switch and the working direction of the machine, a telescopic alarm is slewed out to the left or the right up max. 3 300 mm from center of track. The telescopic arm carries a double-flanged guide roller and a shank for the clamp. The latter is closed automatically during working operation. The 3-rail lifting is controlled from the operator’s seat in the work cabin. The leveling unit controls the lifting operating.
The outstanding features at a glance
4-rail tamping in addition to 3-rail lifting.
Four tamping units working independently.
Telescopic jibs to extend the outer tamping units.
Tamping units can be adjusted to slanting sleepers from the operator’s seat.
With all its advantages, the new Unimat 4S sets the standard for perfect maintenance of switches and crossings

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy