Search Forum
Blog Entry# 1526573
Posted: Jun 28 2015 (10:15)
114 Responses
Last Response: Jun 29 2015 (11:39)
114 Responses
Last Response: Jun 29 2015 (11:39)
hats off to the concerned people for creating such a time-table.
Ndls Aljn 131 kms in 1:40 hrs at 78 kmph whereas its initial 35 kms NDLS - MIU every train takes 30-50 minutes lets consider this takes 40 minutes, now with 1 hour in hand this has to cover 96 kms Maripat Aljn in 1 hour for on time arrival at ALJN practically impossible as there are various slowdowns.
Now the other part the terrific time-tabling stuff. ALJN CNB Part.
ALJN...
more...
Ndls Aljn 131 kms in 1:40 hrs at 78 kmph whereas its initial 35 kms NDLS - MIU every train takes 30-50 minutes lets consider this takes 40 minutes, now with 1 hour in hand this has to cover 96 kms Maripat Aljn in 1 hour for on time arrival at ALJN practically impossible as there are various slowdowns.
Now the other part the terrific time-tabling stuff. ALJN CNB Part.
ALJN...
more...
95 Public Posts - Sun Jun 28, 2015
10 Public Posts - Mon Jun 29, 2015
Arey kehna kya chahte ho bhai? :D
When u have left with nothing to defend ur bringing in elements like AC, the holy month and very cleverly blaming others for everything
I've already told u there's something called as Working Timetable (do some research on it) which is different from public tt by so don't get fooled by that speed, These TT's are designed after such careful planning and it does not take a minute for u to call it trash
When...
more...
When u have left with nothing to defend ur bringing in elements like AC, the holy month and very cleverly blaming others for everything
I've already told u there's something called as Working Timetable (do some research on it) which is different from public tt by so don't get fooled by that speed, These TT's are designed after such careful planning and it does not take a minute for u to call it trash
When...
more...
8 Public Posts - Mon Jun 29, 2015