Search Forum
Blog Entry# 1548109
Posted: Jul 22 2015 (22:09)
4 Responses
Last Response: Jul 22 2015 (22:32)
4 Responses
Last Response: Jul 22 2015 (22:32)
Can continue diesel link till vskp from sc... Why to change electric from rjy to vskp.
Even if there is change or no change of loco there must be crew change.
Generally for the trains taking in bvrt route from bza crew duty isnfrom bza to rjy or cct
So alon withcrew change they are doing loco change also.
From rjy the loco is controlled and alloted bybSR shed previously I.e either ajj or rpm till bbs, present pos I...
more...
Generally for the trains taking in bvrt route from bza crew duty isnfrom bza to rjy or cct
So alon withcrew change they are doing loco change also.
From rjy the loco is controlled and alloted bybSR shed previously I.e either ajj or rpm till bbs, present pos I...
more...
Power link adjustment with any train or may be zonal revenue matter.
Because of pushkaram they are not doing any loco change at RJY so upto 25th all trains which have loco change at RJY will run with diesel link upto VSKP.