NCR - maar bhi, raftaar bhi - Harshit Sharma

Search Forum
<<prev entry    next entry>>
Blog Entry# 1549283
Posted: Jul 24 2015 (10:50)

No Responses Yet
General Travel
679 views
0

Jul 24 2015 (10:50)  
 
GorakshaSingh
GorakshaSingh   1235 blog posts
Entry# 1549283              
Some excerpts from Bibek Debroy 's thinking, the man tasked to submit a reform model for IR-
This para deals with saturation and is to those demanding extra stops.
/
/
------------------------------------------------------------------------------------
Let's
...
more...
think of a railway route as a track that takes us from point X to point Y.
Some stations are junctions, in the sense that more than one route passes through that station.
To be called a junction, the norm is that at least three routes must pass through the station.
A junction leads to additional problems of switching and signalling. Roughly, there are around 300 railway junctions. Which junction has most routes passing through?
Obvious responses about a busy railway station won't work. "Busy" originating or terminating stations aren't junctions.
Actually, Mathura is the junction with most routes (six broad gauge, one metre gauge) passing through. Roughly, a cluster of 23 ordinary stations will have a junction, because that's when one will confront another route.
There are exceptions like Nagpur and Ajni stations, where distance between the two stations is only three kilometres. But in general, the distance between two stations is between six and eight km and the distance between two junctions is between 100 and 150 km.
To make the point, I am going to use a simple example.
Think of a single line track between two ordinary stations. At any specific point in time, only a single train, moving in either of the two directions, can be on that track.
In jargon, in this simple example, that track between two stations is called a block section.
Time will be spent on decision-making and the operating of signals, on the driver's perception and response, and on the train clearing that block section. Let's say 10 minutes for all this. What's a reasonable speed for this train?
Remember this isn't a Shatabdi or a Rajdhani. It stops at both stations.
The answer is that anything more than 30 km/hour is impossible. If for computational simplicity if we take the distance between two stations as 10 km, half an hour per train (adding the 10 minutes).
Thus two trains per hour, 48 trains per day, even if one ignores time required for maintenance of track.
That's the capacity of this block section. I recently met a MP who wanted more stops, more trains and greater punctuality.
That's a logical impossibility.
Out of 1,219 block sections on IR, 233 are at between 100 and 120 per cent capacity, 193 at between 120 and 150 per cent capacity and 66 at more than 150 per cent capacity.
This is especially serious on the high-density network, that between the metros.
Image: The government must promote larger private investment in Indian Railways.
If you want more, and faster, trains between Jodhpur and Jaisalmer, that's never going to a problem, not today.
But that's not where people want more trains.
There is an unaddressed issue of unviable routes.
There are routes on which there are few trains.
There is Ledo and there is Tundla. Within Delhi, there are stations on Delhi Ring Railway. But for the high-density network, options are limited.
Here are some: (1) Use technology to improve efficiency, including signalling. (Automatic signalling can de facto increase capacity by splitting the block into segments.)
(2) Reduce stops between junctions, so that throughput of trains through ordinary stations is faster.
Image: It's time the government rationalizes route network in the Indian Railways. Photograph: Reuters
(3) Back-of-the-envelope, badly-strained capacity is probably around 5,000 km of track. At Rs 10 per km, find the required Rs 50,000 crores.
But since these capacity constraints are on high-density networks, they don't fit the category of national priority projects and GBS (gross budgetary support) won't be available for this. (4) While one figures out how to find resources, rationalise the number of trains.
I said rationalise, I didn't say eliminate. Ignoring freight trains, does one need 13,000 passenger trains every day?
Why have passenger trains with rakes of eight or nine coaches? Such a merger and consolidation has already been carried out for goods trains, and some doubled trains have more than 120 wagons.
If all trains (segregated into three groups: Rajdhani/Shatabdi/Duronto, mail/express, and ordinary) have a template of 24 coaches, there will be no additional shortages because of consolidation.
One should probably start with the Allahabad-Kanpur-Varanasi-Mughalsarai stretch - symptomatic of capacity problems, since every day 400 trains pass through this stretch.
But IR is reluctant to touch (1) and (2) - and can't find the non-GBS of Rs 50,000 crores.
--------------------------------
Bibek Debroy is a member of the National Institution for Transforming India, or NITI. Views are personal

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy