Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Start RailFanning NOW, learn to live - before you run out of time - Varun

Search Forum
<<prev entry    next entry>>
Blog Entry# 1571379
Posted: Aug 22 2015 (17:02)

4 Responses
Last Response: Aug 24 2015 (09:17)
General Travel
4863 views
0

Aug 22 2015 (17:02)   22637/West Coast SF Express (PT)
 
Guruvayurappan Angannan
Guruvayurappan Angannan   3 blog posts
Entry# 1571379            Tags  
train number 22637 west coast cheenai to mangalore first they 2 general coach on front and back now back side only one general coach available , very strangle people in one general coach last two days very problem
now is onam session please add the 2 genral coaches
Translate to English
Translate to Hindi

2299 views
0

Aug 22 2015 (17:09)
Onemail~
Onemail~   6523 blog posts
Re# 1571379-1              
Not sure about exact reason. But this is my observation. Initially when extra Ac was added, they removed hcpv. Now hcpv is added back, and one general is removed from rear end. Mail is only 23 coach..I guess if hcpv is there, 23 is maximum allowed coach rather than usual 24. Just wild guess based on observation.
Translate to English
Translate to Hindi

2534 views
0

Aug 22 2015 (17:59)
NIRMAL~
NIRMAL~   303 blog posts
Re# 1571379-2              
Can this hcpv go with maq sfe than mail as sfe is just 22 coacher. Mail should be made 24 coacher with p7 at the earliest once electrification officially reach CAN .
Translate to English
Translate to Hindi

2465 views
0

Aug 22 2015 (19:18)
Onemail~
Onemail~   6523 blog posts
Re# 1571379-3              
SF, 12685/86 is having CBC rake. I guess HCPV for CBC rake is not there. That is one reason for HCPV with mail.
P7 will be considered for Mail. RPM is getting new p7s. But will have to wait. Between MAS and SRR, P4 can perform equally well as P7. Small lag due to lesser acceleration is only disadvantage. But with slack between TUP and PTJ as well as OTP and SRR, this will be nullified. So as of now, p4 is ok with mail. Once fully electrified, then p7 will be better option.
Translate to English
Translate to Hindi

3199 views
1

Aug 24 2015 (09:17)
12YEARSINIRI^~   11515 blog posts
Re# 1571379-4               Past Edits
GT was getting HCPV. I guess CBC can be connected with normal coaches, I snapped a pic at Avadi where an inspection car (non CBC) with TVC mail. see the following link
/blog/post/1474494
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy