Where everyone is just busy in playing politics... L&T investing their day and night to complete the Lucknow Metro(LMRC) project before the expected time..The Stations have started to take the original form...
Pic 1. Transport Nagar metro station where spans are ready to be kept
Pic 2. Krishna Nagar Metro Station
Pic 3. Singar Nagar Metro Station, where pillars are ready to be conncconnected....
more...
Pic 1. Transport Nagar metro station where spans are ready to be kept
Pic 2. Krishna Nagar Metro Station
Pic 3. Singar Nagar Metro Station, where pillars are ready to be conncconnected....
more...
6 Posts
After the ground breaking ceremony was held in April earlier this year, the Lucknow Metro project is moving EXTREMELY fast keeping in mind the UP state elections which will be held in 2017. Here’s a gist of some of the recent updates.
As per a recent report:
1) The LMRC is planning to start trial runs in August 2016 for which one 4-car train will be brought from Delhi since the Metro trains for Lucknow might not be available by then.
2)...
more...
As per a recent report:
1) The LMRC is planning to start trial runs in August 2016 for which one 4-car train will be brought from Delhi since the Metro trains for Lucknow might not be available by then.
2)...
more...
This is all the latest info we have from the LMRC for the month of August.
Hope kanpur n varanasi metro work will be alloted to l&t in future
But CNB and BSB Metro will only start after Elections and then the pace of work will not be the same.