verma199rahul 5 blog postsWhat does the signs like '%, -, =, |, e.t.c.' indicate in the Time Table of the Train on this site?
That is status of line, whether double electrified, single electrified, diesel, electrification in progress, etc.
.
Click here /atlas and click on colour key to know the meaning.
.
Click here /atlas and click on colour key to know the meaning.
%==% means Construction-Electrification of Double BG Track
%--% means Construction-Electrification of Single BG track
|--| Single Diesel BG Track
|==| Double Diesel BG track
So, Basically -- is for Single BG and == is...