Search Forum
Blog Entry# 1594361
Posted: Sep 19 2015 (13:46)
2 Responses
Last Response: Sep 19 2015 (22:31)
2 Responses
Last Response: Sep 19 2015 (22:31)
Sep 19 2015 (13:46) 58429/Khurda Road - Mahipur Passenger (UnReserved) | BBS/Bhubaneswar (6 PFs)
Yantravinyas
Yantravinyas 20339 blog postsTrial run of a railway engine started Friday between Begunia and Rajsunakhala, a 9.5-km stretch of the Khurda-Bolangir railway line.
The railway engine started from Begunia at 12:30 pm and reached Sunakhala at 1:40 pm
LINE WILL BE INSPECTED BY COMMISSIONER OF RAILWAY SAFETY BEFORE ITS COMMISSIONING
The railway engine started from Begunia at 12:30 pm and reached Sunakhala at 1:40 pm
LINE WILL BE INSPECTED BY COMMISSIONER OF RAILWAY SAFETY BEFORE ITS COMMISSIONING