Search Forum
Blog Entry# 1596631
Posted: Sep 22 2015 (09:57)
7 Responses
Last Response: Sep 22 2015 (20:56)
7 Responses
Last Response: Sep 22 2015 (20:56)
New Facilities/Technology
SR/Southern
![](http://st.indiarailinfo.com/images/1.png)
Kamban Express~ 355 news posts
விருத்தாசலம்,
விருத்தாசலம்–திருவெண்ணெய்நல்லூர்...
விருத்தாசலம்–திருவெண்ணெய்நல்லூர்...
3 Public Posts - Tue Sep 22, 2015
Translation in Gist
Inspection in 39 Km Vridachalam - Tiruvennainallur Second Electrified Track in Viluppuram - Dindigul line done by CRS Sh. SK Mittal. Yesterday, he inspected the second track, engineering works, ballast stone foundation, bridge strength, signalling, etc... Southern Rly GM Mishra, RVNL Chief Project Mgr Pradeep Kaur, TPJ Division Rly Mgr Agarwal were with him inspecting the track in 9 trolleys ... Today (22/09/2015) at 1430 hrs, High Speed Trial would be done ...
Inspection in 39 Km Vridachalam - Tiruvennainallur Second Electrified Track in Viluppuram - Dindigul line done by CRS Sh. SK Mittal. Yesterday, he inspected the second track, engineering works, ballast stone foundation, bridge strength, signalling, etc... Southern Rly GM Mishra, RVNL Chief Project Mgr Pradeep Kaur, TPJ Division Rly Mgr Agarwal were with him inspecting the track in 9 trolleys ... Today (22/09/2015) at 1430 hrs, High Speed Trial would be done ...
3 Public Posts - Tue Sep 22, 2015