Search Forum
Blog Entry# 1628908
Posted: Oct 26 2015 (11:10)
No Responses Yet
No Responses Yet
Goods Train Trial Run Held on Pkd-Pollachi Broad Gauge Line
• A load tolerance test was conducted on Sunday in the newly gauge converted Palakkad-Pollachi rail stretch using a goods train comprising 42 wagons. The goods train reached Palakkad Junction from Mangalore by 1 p.m. carrying bags of fertilizer.
• It reached Pollachi in 45 minutes and proceeded to Tiruchirappalli via Palani. The speed was 45 km/hour.
• The...
more...
• A load tolerance test was conducted on Sunday in the newly gauge converted Palakkad-Pollachi rail stretch using a goods train comprising 42 wagons. The goods train reached Palakkad Junction from Mangalore by 1 p.m. carrying bags of fertilizer.
• It reached Pollachi in 45 minutes and proceeded to Tiruchirappalli via Palani. The speed was 45 km/hour.
• The...
more...