Search Forum
Blog Entry# 1659153
Posted: Nov 23 2015 (18:26)
7 Responses
Last Response: Nov 23 2015 (20:54)
7 Responses
Last Response: Nov 23 2015 (20:54)
Nov 23 2015 (18:26) 22204/Secunderabad - Visakhapatnam Duronto Express
![](http://st.indiarailinfo.com/images/1.png)
vsaikrishna23~
vsaikrishna23~ 2539 blog postsWhy not scr can make this daily duronto by spliting into two rakes by adding 6-8 sleeper coaches 6-3A ,2-2A,1-1A and 8SL coaches and i think one EOG can handel 9ac coaches
2 Posts
Vskp-kzj no where 130mps section is not avalible i dnt know much about kzj-sc section
For sleeper train SCR wont give that agressive schedule. Even LHB AC gets less avg speed in SCR.
SCR is not known for high speed train like SR
SCR is not known for high speed train like SR
Lhb ac is normal ac sf exp even if icf is problem then swaping vskp duronto and ltt duronto Rake and can make hybrid lhb and can run daily like ngp cst duronto
If it becomes daily means needs stop at RJY also but speed should be same.