Work is going on full swing at #BAREILLY_CITY stn.....
1.platform no.1 hve been elevated
2.tracks being laid btw bareilly jn and bareilly city via underpass single line
After the full construction of #BC stn, BE-BC Underpass line,construction of #PF5 n 6 at Bareilly jn NER etc. ,then only trains will increase btw LKU-BC-KSJ Route.
1.platform no.1 hve been elevated
2.tracks being laid btw bareilly jn and bareilly city via underpass single line
After the full construction of #BC stn, BE-BC Underpass line,construction of #PF5 n 6 at Bareilly jn NER etc. ,then only trains will increase btw LKU-BC-KSJ Route.