Dec 29 2015 (15:34) IMG33147-739298/♥♥Sikkim Expess (via Murshidabad-Bagdogra-Siliguri)♥♥
2254 net green flags 3 green per TrainCustom Ratings
Dj.Railfan1982~
Dj.Railfan1982~ 847 img trains 158 popular2254 net green flags 3 green per TrainCustom Ratings
Loco Reversal Needed At SGUJ, Not Possible In 10 Mins. However.... Track Till Rangpo Laid ? I Heard Somewhere Railway Is Upto Laying Tracks Till Gangtok
thanks fr mentioning. . added loco reversal at SGUJ & halt time increased to 15 mins
The Indian Railways signed a contract with the construction company, IRCON, only in May 2010 and the work has been progressing at a very slow pace. The final alignment had not been fixed for the first 22 km through elephant sanctuary forest in 2013 and the final clearance of environment ministry had not been received. To obtain approval of the environment and forest ministry, the railways made a proposal in February 2013 to install elephant sensors along the stretch of the proposed railway line in Mahananda elephant sanctuary or run the trains at a speed of only 20 km per hour in the forest area and stop when an elephant is sighted close to the track. Construction of the railway line had started by March 2013.