Current data is enough for update & the wires are charged as CRS took place.
Still CRS inspection is not done this was a trial by NR MB only not the loco trial by CRS
As per /blog/post/1696942 trials are done with eloco, means wires are joined at both ends and charged with 25kv. Enough proof for update.
OHE wires are not permanently electrified it was charged for one day trial only confirmed this from SM at mahrauli they will charge it again on permanent basis before CRS inspection after removing some glitches