Search Forum
Blog Entry# 1733407
Posted: Feb 08 2016 (19:55)
7 Responses
Last Response: Feb 09 2016 (15:37)
7 Responses
Last Response: Feb 09 2016 (15:37)
Feb 08 2016 (19:55) IMG26109-1175410/♥♥Bangalore Cantt. - Ernakulam AC Superfast Express♥♥
553 net green flags 6 green per TrainCustom Ratings
![](http://st.indiarailinfo.com/images/1.png)
esrikant~
esrikant~ 91 img trains 51 popular553 net green flags 6 green per TrainCustom Ratings
Please flag this train, which will ease the rush on the Bangalore - Kerala route. It will cater to the needs of the huge number of people traveling to Kerala for the weekend. It will surely be a hit if introduced.
2 Posts
then i guess you don't have much knowledge on that ghat section. there had been some incidents where elephants were run over by trains some year back. since then the ghat section limit is 50kmph especially during night. the trains may sometimes cover the section faster but it is necessary to add this much time.
i did not say about any delay being covered later. i just told you the thing which needs to be kept in mind while creating TT. rest it is completely your wish bro as this is your IMG train.
Sir I have personally traveled and witnessed trains covering the distance in about 55 minutes in the early morning! I know about the speed restrictions. I have traveled innumerable times on this route. I'm sure that you cannot say I don't know much about it. The speed restrictions are between Madukarai and Chullimada cabin. From CBE to MDKI (excepting PTJ where they have to switch tracks) and CLMD to PGT trains can travel at around 100 kmph. So trains usually cover this section in about an hour. I have made this train take 55 minutes. There is not much difference.
TT of trains have been prepared with slack in this route. So since I've already provided slack after PGT, I thought it would be unnecessary to make it take more time in this section.
fine. as per your wish but i rarely find trains moving faster(in TT). anyways Green to you for the much needed train