Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

12988 - बारह नौ सौ अठासी , इसके नखरे हैं नवाबी ! - Keshav Saxena

Search Forum
<<prev entry    next entry>>
Blog Entry# 1741838
Posted: Feb 17 2016 (22:47)

6 Responses
Last Response: Feb 20 2016 (22:37)
General Travel
2823 views
3

Feb 17 2016 (22:47)   22811/Bhubaneswar - New Delhi Tejas Rajdhani Express (via Adra) | GAYA/Gaya Junction (10 PFs)
Sanz~
Sanz~   8528 blog posts
Entry# 1741838            Tags  
This train can easily be speeded up by 1.5 hours in between ADRA-GAYA.
IT takes 5 hours while 120 MPS 12281 takes 3.5 hours
Translate to English
Translate to Hindi

1 Posts

1284 views
0

Feb 18 2016 (00:32)
Sanz~
Sanz~   8528 blog posts
Re# 1741838-2              
Dono ek category ki train hai same route pe.
I a duronto can so can this one.
GMO & KQR halts hardly matter.
Translate to English
Translate to Hindi

1663 views
0

Feb 20 2016 (13:04)
Suri~
Suri~   7928 blog posts
Re# 1741838-3              
The route from ADRA to GMO via BJE-MHQ is single and slow with full of speed restrictions.
Moreover Its Schedule is prepared in such a way that it has to get overtaken by HWH Rajdhani and SDAH Rajdhani between GMO & GAYA. So that's why huge slack is provided between ADRA & GAYA , so that these overtakings is done without hampering much of this train schedule. Whereas Duronto doesn't has any these special prescriptions.
Translate to English
Translate to Hindi

1551 views
0

Feb 20 2016 (18:42)
Sanz~
Sanz~   8528 blog posts
Re# 1741838-4              
I kmow that 12301 skips it at gmo and 12313 at kqr.
But why have such a schedule.
The train can depart bbs later by 1.5 hours still for better timings
Translate to English
Translate to Hindi

1571 views
0

Feb 20 2016 (19:21)
Suri~
Suri~   7928 blog posts
Re# 1741838-5              
Slot availability from ECoR and SER is also needed. Only ECoR can't do anything.
And if i am not wrong i think its schedule between NDLS & GMO is same as of earlier times when BBS Rajdhani used to go via HWH.
Translate to English
Translate to Hindi

1554 views
0

Feb 20 2016 (22:37)
Sanz~
Sanz~   8528 blog posts
Re# 1741838-6              
When adra gmo line is dismantled tab kya hoga.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy