Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Purulia Express: লালপাহাড়ীর দ‍্যাশে যাবি? চিন্তা কিসের লো? বিকাল বেলা হাওড়া থেকে পুরুল্যা এক্সপেরেস পাবি। - Dip

Search Forum
<<prev entry    next entry>>
Blog Entry# 1755871
Posted: Mar 03 2016 (05:05)

8 Responses
Last Response: Mar 03 2016 (17:44)
General Travel
6253 views
0

Mar 03 2016 (05:05)   12639/Brindavan Express
 
ignatiusjosephblr
ignatiusjosephblr   51 blog posts
Entry# 1755871            Tags  
Hi, the SR Brindavan/12639 is held at Baiyappanahalli Station is not its fault, as per some Train fans posted below It is SWR Bangalore Division to act bold and swift to clear at main-line from KJM to BNC instead of holding at BYPL so that Karnataka Express-12628 Lately crossing between Yelhanka Station and Hormavu-Agra gate crossing late but should be at BNC at 13.10 hrs. and Brindavan at BNC at 13.20 hrs and reach 5km SBC need 40 mins? So due to Karnataka running late it is not good to hold Brindavan to drag slow from Jolarpettai onwards to> Kuppam> Bangarpet>KJM run slow 30-50+ late running so that Karnataka to cross BYPL is very strange. Same Brindavan Chennai 7.50a >Arakkonam 68 km takes 1 hour, MAS-Katpadi 130 km reach around 9.55a.
So
...
more...
at BYPL held and Karnataka crossing is not overtaking. when both trains running same time and Karnataka with more speed if overtakes then Rail-Fans can tell with video evidence.
For D.D to survive removed 50 yrs Brindava 3 A/c CC. 10 Reserved Coaches and Pantry car as per Times of India/7-2-2014 reports "railways robs Brindavan Express to pay bangalore double-decker"
Hope other Rail-Fans now know the real reason taking prime time Brindavan slot. Even ALCO WDM2 Brindavan faster covered SBC-MAS 5 hrs time with 3 stops in 1966 onwards till 90s as per media. Atleast at present even Unreserved good coaches can increase speed by another 20-30 mins instead of dragging or buffer time.
Now 2016-17 Rail Budget Unreserved Superfast Trains increased the speed in North Indian Trains.
Hope our Railway Officials increase Brindavan SPEED to reach both directions in less than 5.30/40 mins possible. Cause Bangalore-Chennai by ROAD within 4-5 years will cover much less time aprox 3-4 hrs time.

Translate to English
Translate to Hindi

2144 views
1

Mar 03 2016 (12:23)
Onemail~
Onemail~   6523 blog posts
Re# 1755871-1              
Speed up of Brindavan, tough chance. Railway is promoting DD. There was even plan to rename DD as Brindavan, since Brindavan was DD during its initial years.
Translate to English
Translate to Hindi

7 Public Posts - Thu Mar 03, 2016
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy