Mar 03 2016 (16:17) 12521/Barauni - Ernakulam Rapti Sagar Express (PT)
![](http://st.indiarailinfo.com/images/1.png)
Railfan_bihari
Railfan_bihari 5266 blog postsWhy is it still running with diesel loco between ljn-jhs ??..This train undergoes rake reversal at ljn so electric engine can be attached there.the time consumed during loco change at jhansi can be avoided by doing so...
1 Public Posts - Fri Mar 18, 2016
Has lsa issue so running with diesel link frm jhs.electrification between basti gkp will only slove this issue...
Regarding late run...cnb jhs is single and number of freight trains on that route increased after electrification causing more delay for crossings.once the doubling of cnb jhs is compleated..the delay will be reduced
Regarding late run...cnb jhs is single and number of freight trains on that route increased after electrification causing more delay for crossings.once the doubling of cnb jhs is compleated..the delay will be reduced
2 Public Posts - Fri Mar 18, 2016