Search Forum
Blog Entry# 1767717
Posted: Mar 15 2016 (13:28)
4 Responses
Last Response: Mar 16 2016 (11:20)
4 Responses
Last Response: Mar 16 2016 (11:20)
Mar 15 2016 (13:28) RQJ/Raninagar Jalpaiguri Junction (2 PFs)
![](http://st.indiarailinfo.com/images/1.png)
somnath.biswas
somnath.biswas 25 blog postsIn which station Teesta Torsa Express joined to form one train Nos. 13142 & 23142.
At Raninagar Jalpaiguri Jn.
13142 Comes From New Alipurduar
23142 Comes from Haldibari and Joins With 13142
13142 Comes From New Alipurduar
23142 Comes from Haldibari and Joins With 13142
I don't know how joining happens? If 13142 attaches with 23142 from behind then the loco of 13142 should to be 'sandwitched'.
The Link Train Is 1st Brought to a Platform Which Is Empty , Usually adjacent To 13142.
The Loco of Link Express Is Removed From Front and Is Attached Backside, Then The Train(23142) is Shunted and is moved towards 13142 and is Attached from Back Side and The Back engine Is Removed and the Train Continues its Journey.
The All Process Usually Takes nearly 30-35 Mins.
The Loco of Link Express Is Removed From Front and Is Attached Backside, Then The Train(23142) is Shunted and is moved towards 13142 and is Attached from Back Side and The Back engine Is Removed and the Train Continues its Journey.
The All Process Usually Takes nearly 30-35 Mins.