Search Forum
Blog Entry# 1780282
Posted: Mar 26 2016 (14:48)
35 Responses
Last Response: Mar 29 2016 (20:11)
35 Responses
Last Response: Mar 29 2016 (20:11)
Mar 26 2016 (14:48) 12049/Gatiman Express | NDLS/New Delhi (16 PFs)
Ashwin Joseph
Ashwin Joseph 28 blog postsRake of Gatimaan Express at NDLS.
Date : 23 March 2016
The rake consisted of 12 coaches- 2 Generator cars, 1 Executive Chair Car, and 9 AC Chair Cars
Date : 23 March 2016
The rake consisted of 12 coaches- 2 Generator cars, 1 Executive Chair Car, and 9 AC Chair Cars
30 Posts
Full fencing is badly required but not at all feasible in india as of now.
We have majority road crossings here as unmanned/manned without flyovers.
Plus many farmers have farming lands on both sides of tracks. Some are like their half land is this side and other half is that side. So they have to cross the tracks irrespective of risks. Railways have taken the land on lease to build tracks on it.
Plus...
more...
We have majority road crossings here as unmanned/manned without flyovers.
Plus many farmers have farming lands on both sides of tracks. Some are like their half land is this side and other half is that side. So they have to cross the tracks irrespective of risks. Railways have taken the land on lease to build tracks on it.
Plus...
more...
Yes, in fog trains are not visible. So IR puts these stickers on engine of trains to make it visible for public and avvoid accidents in railway crossing.
gatimaan express train bhale hi 160 kmph semi high speed wali train ho par sirf 195 km tak hi chalegi ndls-agra tak.
is train ko bhopal tak ya phir cstm tak chalate to aur achha lagta
is train ko bhopal tak ya phir cstm tak chalate to aur achha lagta