Search Forum
Blog Entry# 1787360
Posted: Apr 01 2016 (23:10)
14 Responses
Last Response: Apr 04 2016 (07:50)
14 Responses
Last Response: Apr 04 2016 (07:50)
New Facilities/Technology
SR/Southern
KrisGopal^~ 3581 news posts
Second line between Trichy and Manapparai opens today
TNN...
TNN...
2 Public Posts - Fri Apr 01, 2016
7 Public Posts - Sat Apr 02, 2016
The first 4 will most probably never be extended anywhere beyond Madras. These have practically 100% patronage for MAS itself. Extension for these trains would be of absolutely no use.
There was a demand to extend Circar express to PDY, but it's current RSA arrangement means that KCG-MS also has to be extended to PDY. But with the current timings, both trains will be running in parallel to the MS-PDY passenger and MS-Tuticorin express on almost the same time slot. Because of this SR is not interested in extending these trains. Only MAS-HYB might have a chance of extension as this is an SR train and SR can play around with the RSA to enable extension....
more...
There was a demand to extend Circar express to PDY, but it's current RSA arrangement means that KCG-MS also has to be extended to PDY. But with the current timings, both trains will be running in parallel to the MS-PDY passenger and MS-Tuticorin express on almost the same time slot. Because of this SR is not interested in extending these trains. Only MAS-HYB might have a chance of extension as this is an SR train and SR can play around with the RSA to enable extension....
more...
3 Public Posts - Sun Apr 03, 2016
1 Public Posts - Mon Apr 04, 2016