Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal Android   RailCal iPhone

site support

कोशी की जीवन रेखा — मानसी सहरसा रेलखंड - Prabhat Sharan

Search Forum
<<prev entry    next entry>>
Blog Entry# 1791493
Posted: Apr 05 2016 (20:53)

19 Responses
Last Response: Apr 06 2016 (16:45)
Imaginary
3162 views
8

Apr 05 2016 (20:53)   IMG69884-1422835/♥♥KATHGODAM-BAREILLY-JABALPUR EXPRESS♥♥
 
IWANTTOBERLYMINISTER4EVER~
IWANTTOBERLYMINISTER4EVER~   6941 img trains   6903 popular
90422 net green flags   13 green per Train
Entry# 1791493            Tags  
Custom Ratings
Direct Link from KATHGODAM-BAREILLY to JABALPUR
Views, suggestions/comments and FLAGS Please
Thanks
Translate to English
Translate to Hindi

14 Posts

799 views
0

Apr 06 2016 (16:10)
SaifAliSalmani30^~
SaifAliSalmani30^~   11425 blog posts
Re# 1791493-15              
reversal needed at BLM Decrease Halt Time at BE it is more than enough 5 min is enough Slack You have Provided Already Between BC and BE
Translate to English
Translate to Hindi

781 views
0

Apr 06 2016 (16:11)
Suri~
Suri~   7928 blog posts
Re# 1791493-16              
Corrections upcoming for you:
IZN-BC : minimum 25 minutes are required. This 4km tracks is very close to houses and trains are never allowed to cross 10-15kmph speed.
Reduce the halt time Bareilly Jn to 5 min and increase the halt at Bareilly City to 10 min.
Rake Reversal is required at Balamau Jn. So increase the halt time at BLM to 20 minutes.
...
more...

Chitrakutdham karwi to Satna: 2hr time is required.
Correct these things.
I am giving red. Thanks.

Translate to English
Translate to Hindi

816 views
0

Apr 06 2016 (16:20)
~   271 blog posts
Re# 1791493-17              
Green flag. Still some modification left.
Instead of stopping train at BE for 20 mins introduce some slack in the BC-BE stretch. LR required at BLM.
Translate to English
Translate to Hindi

819 views
0

Apr 06 2016 (16:38)
prukit~   850 blog posts
Re# 1791493-18              
IZN is small station not enough platforms
BE is busy station on main line ....only 5 platforms(4 nr +1 ner)... a platform for 20 mins is not simply given to a non originating train!
only BC is available to host train for such long lengths.
Translate to English
Translate to Hindi

682 views
1

Apr 06 2016 (16:45)
IWANTTOBERLYMINISTER4EVER~
IWANTTOBERLYMINISTER4EVER~   46940 blog posts
Re# 1791493-19              
All dne check and tell me if any more corrections
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy