Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Mumbai Local - RailFanning nirvana.

Search Forum
<<prev entry    next entry>>
Blog Entry# 1879337
Posted: Jun 04 2016 (12:14)

4 Responses
Last Response: Jun 05 2016 (10:47)
Imaginary
2619 views
5

Jun 04 2016 (12:14)   IMG08099-1219023/♥♥Shaan-e-Rewa SF Express (Mumbai LTT-REWA)♥♥
 
Shashank^~
Shashank^~   156 img trains   71 popular
930 net green flags   7 green per Train
Entry# 1879337            Tags  
Custom Ratings
Please rate the only connectivity or Rewa with Mumbai. This train is bound to cater passengers of Rewa, Satna, Jabalpur, Itarsi and Khandwa. Suggestions are welcomed!
return train- /train/46679
Translate to English
Translate to Hindi

1941 views
3

Jun 04 2016 (12:23)
AbhishekVivek^~
AbhishekVivek^~   35520 blog posts
Re# 1879337-1               Past Edits
Suggestions For Your Train -
1. Departure Time Is Not Possible At All At Evening.. Tracks Are Totally Packed With Already Existing Long Distance Trains And Suburban EMU's.
2. Bankers Are Attached At Kasara And Detached At Igatpuri.
3. Kalyan - Kasara Give Speed Of 55 - 60 Kmph & Kasara - IGP That's Hai So Atleast 25 - 30Mins Here.
4.
...
more...
Add Nasik Road As Halt.. Manmad, Kalyan Halts Reduce To 3Mins.
5. Bhusaval - Khandwa Section Is Always Slack Section
Reference - 12188 Mumbai CST - Jabalpur Garibrath And Many Other Trains.
6. Atleast 1Hr Delay Would Increase In Jabalpur - Satna Section Due To Such High Speed.. Jabalpur - Satna 70Kmph Of Average Is Enough.
7. Add More Slack In Satna - Rewa Section.
8. CSTM - IGP Give ET WAP-4 & ET - REWA Give ET WDM-3A/D / WDP4D

Translate to English
Translate to Hindi

1508 views
1

Jun 04 2016 (12:43)
sujitNGP~
sujitNGP~   1361 blog posts
Re# 1879337-2              
BSL halt should be for 10 min. Crew change and water filling is done here.
ET halt should be for 20 min. Loco change from E to D will be done here. electrification of ET-JBP-STA-REWA will take long time.
NK has to be added with 3 min halt atleast.
Translate to English
Translate to Hindi

1493 views
2

Jun 05 2016 (10:31)
Shashank^~
Shashank^~   7685 blog posts
Re# 1879337-3              
Thank you for the suggestions!
I have incorporated the following things-
1. Due to nonavailability of platform during evening, terminal station has been set to LTT.
2. Bankers Are Attached At Kasara And Detached At Igatpuri.
3.
...
more...
Nasik Road has been added as a halt.
4. Slack has been given in BSL-KNW section.
5. JBP-STA section has been relaxed a bit.
6. Slack has been added in STA-REWA section.
Considering the possibility of electrification, i have incorporated a e-loco from LTT to REWA.

Translate to English
Translate to Hindi

1462 views
0

Jun 05 2016 (10:47)
Shashank^~
Shashank^~   7685 blog posts
Re# 1879337-4              
Flags please.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy