Search Forum
Blog Entry# 1896920
Posted: Jun 16 2016 (13:37)
7 Responses
Last Response: Jun 17 2016 (13:29)
7 Responses
Last Response: Jun 17 2016 (13:29)
a new bridge reqd over River Hoogly to shorten the distance from Kolkata to Haldia.
at present HWH HLZ is 140 kms.
it can be reduced to 75 kms (SDAH-DH-DZK-HLZ) if this bridge is made,
at present HWH HLZ is 140 kms.
it can be reduced to 75 kms (SDAH-DH-DZK-HLZ) if this bridge is made,
2 Public Posts - Thu Jun 16, 2016
It would have been great. But the main problem is technical aspects of making that bridge. At Diamond Harbour, the width of river and force of flow is the main obstacle. Otherwise it would have been a great project.
3 Public Posts - Thu Jun 16, 2016
1 Public Posts - Fri Jun 17, 2016