New Technological Developments In Electric Traction
High Rise OHE(7.57 M) & 2x25 KV System
High Rise OHE(7.57 M)
...
more...
High Rise OHE(7.57 M) & 2x25 KV System
High Rise OHE(7.57 M)
...
more...
1 Posts
This will be used from Ahmedabad to Phulera and Phuelra to Rewari via Ringus..
Complete Western DFC is with high rise OHE & 2x25 KV, 50 Hz AT traction feeding system
Attached
Attached
Good move by railway as Double stack of containers will double the efficiency of one train and it will be cost efficient too.
Tests were initially conducted with a pair of WAG-7 locomotives and later with empty and loaded trains on July 7-8 2008. The locomotive fitted with the high-reach pantograph made four successful runs from Jakhapura station, where standard OHLE is in use, to Tomka station, where the high-rise OHLE is installed. A distance of 21∙9 km was covered under 7450 mm high OHLE, and the transition between standard and high-rise OHLE was negotiated successfully on every trip. Current collection was smooth and almost without arcing on both the transition and high wire sections.
Current collection performance was monitored with the help of...
more...
Current collection performance was monitored with the help of...
more...